Documents / Official release

Gemini 7 Technical Debriefing, 1965

National Aeronautics and Space Administration · 1965 · 222 pages · text from the file's own layer

This is a preliminary transcript of the Gemini 7 technical debriefing, dated December 23, 1965, from the National Aeronautics and Space Administration. It was made from tape recordings of the crew debriefing held December 19 to 21, 1965 at the Crew Quarters, Cape Kennedy, Florida. In it, Frank Borman and Jim Lovell go through countdown, powered flight, insertion, station keeping with the booster, systems, experiments and training. The table of contents also lists a section on visual sightings during orbital flight.

From the source:Release of 2026-06-12 Incident: December 19-21, 1965, Cape Kennedy, Florida. This document is a preliminary transcript derived from voice recordings of the Gemini 7 flight crew debriefing conducted December 19-21, 1965, at the Crew Quarters, Cape Kennedy, Florida. Lights and flashes are mentioned and there is discussion about having proper illumination for vehicle docking. Borman and Lovell discuss celestial and terrestrial observational anomalies and note sightings of Mercury, meteors, aurora, and lightning. They also discuss not being able to see any stars once the Sun comes up.

  • p. 38 …Then ma.king sure that the s/c is alined right and the reticle is up…
  • p. 63 …I put the reprogre.mmer on in the water and started ta.king blood
  • p. 217 …a hand they can have in ma.king the flight plan and how early they should…
52
e:x:actly the same. You get a. good whack and then you sit
there and vibra.te ba.ck a.nd forth for a little bit.
6.14 2X Checklist
Borman 2,000 foot checklist we accomplished with no problem. About
this time, at 2,000 feet, I heard Air Boss calling and we
started communicating with Air Boss. I saw him flying around
while we were still on the chute. Houston came throU8h
a.bout this time and wanted to lmow if we had a. main chute.
I'd ca.lled a.11 these things off, but I guess th.at the com
xmmica.tions-maybe the Auto Cats weren't working or some
thing.
Lovell Air Boss should have called back a.nd said•••
Borman But I called back and confirmed main chute.
6.15 Landing
Borman We hit the water with a. pretty good thud, and your window
went under water, didn't it? Jim's window went under watero
We hit in a drift. We were drifting to the right rear, and
there was a 14 knot wind, and when we hit the sp&eecra.ft
rolled to the right, and your window went under the W&ter,
and mine eticy-ed up. Nothing serious tho'U8h,.
Lo-vell Nothi.ng serious.
6.16 Postlanding Checklist
Borman We extended the .RF antenna. to get e. test for them &nd went
on HF-DF; I hope that somebody heard it. But they had

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is above. 222 pages are in the text index: search them above, or from the library's search.