Documents / Official release

Gemini 7 Technical Debriefing, 1965

National Aeronautics and Space Administration · 1965 · 222 pages · text from the file's own layer

This is a preliminary transcript of the Gemini 7 technical debriefing, dated December 23, 1965, from the National Aeronautics and Space Administration. It was made from tape recordings of the crew debriefing held December 19 to 21, 1965 at the Crew Quarters, Cape Kennedy, Florida. In it, Frank Borman and Jim Lovell go through countdown, powered flight, insertion, station keeping with the booster, systems, experiments and training. The table of contents also lists a section on visual sightings during orbital flight.

From the source:Release of 2026-06-12 Incident: December 19-21, 1965, Cape Kennedy, Florida. This document is a preliminary transcript derived from voice recordings of the Gemini 7 flight crew debriefing conducted December 19-21, 1965, at the Crew Quarters, Cape Kennedy, Florida. Lights and flashes are mentioned and there is discussion about having proper illumination for vehicle docking. Borman and Lovell discuss celestial and terrestrial observational anomalies and note sightings of Mercury, meteors, aurora, and lightning. They also discuss not being able to see any stars once the Sun comes up.

  • p. 25 15 Borman Could you identify any type of the debris? Lovell No, pieces.That is all…
  • p. 61 …LoveJl Frank thought it was in the reef ed con<lition for 3 months . Borman It…
  • p. 64 …Meanwhile , Frank ' s got the checklist out and the guys out there are putting on the…
  • p. 83 …Lovell We might mention here that both Frank and I think making adjust maneuvers without a…
  • p. 90 …We had no problems with air flow. :Borman It would have been a very, very difficult…
  • p. 93 …When I was out of the suit and Frank was in it, we put my suit…
  • p. 118 …Lovell Frank's was better than mine. Whenever I could I would give him the cameras…
  • p. 125 …Lovell It was a necessary evil, Frank. Borman We were a little concerned when we opened…
  • p. 141 131 Borman The reception on HF during the fl i ght was very poor. Lovell Right…
  • p. 172 …Lovell The magnitude of this laser is a lot less than either Frank or I suspected…
47
sensational. Jim was giving vivid descriptions on what was
happening, a.nd I was watching the ba.11.
Lovell That's one thing that no one had ever told us before. I was
a.ma.zed. Maybe it was peculiar to the spacec.raft.
Borman No, Tom and Wally h.a.d mentioned it.
Lovell Oh, is that r i ght? That ablative material went back and hit
the forward end near the recovery section, rather the RCS
secti on; and I thought well, I never heard of this before,
and I was a little worri ed that maybe we were too fa:r off,
a.nd the stuff was going to start getting into recovery
sections. But it tiirned out to be okay.
Borman Another thing was that the windows really got scrounged up
on that ree.ntry; that's something else. I could hardly see
out of my window. Stu.ff was coming over from the heat
shield and hitting it. It was really gunky.
6. 3 Aceelera.tio!!,_Pro.file
Borman Okay. The acceleration profile was very smallo It was a
very high 11.ft reentry, and of course, this results in a
low g and long duration build up. No problem at all.
604 Spacecr&ft Control
Borman Spacecra.ft control was excellent until we g'Ot down to
100,000 .feet or even below 100,000 .feet. We turned on

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is above. 222 pages are in the text index: search them above, or from the library's search.