Documents / Official release

Gemini 7 Technical Debriefing, 1965

National Aeronautics and Space Administration · 1965 · 222 pages · text from the file's own layer

This is a preliminary transcript of the Gemini 7 technical debriefing, dated December 23, 1965, from the National Aeronautics and Space Administration. It was made from tape recordings of the crew debriefing held December 19 to 21, 1965 at the Crew Quarters, Cape Kennedy, Florida. In it, Frank Borman and Jim Lovell go through countdown, powered flight, insertion, station keeping with the booster, systems, experiments and training. The table of contents also lists a section on visual sightings during orbital flight.

From the source:Release of 2026-06-12 Incident: December 19-21, 1965, Cape Kennedy, Florida. This document is a preliminary transcript derived from voice recordings of the Gemini 7 flight crew debriefing conducted December 19-21, 1965, at the Crew Quarters, Cape Kennedy, Florida. Lights and flashes are mentioned and there is discussion about having proper illumination for vehicle docking. Borman and Lovell discuss celestial and terrestrial observational anomalies and note sightings of Mercury, meteors, aurora, and lightning. They also discuss not being able to see any stars once the Sun comes up.

  • p. 25 15 Borman Could you identify any type of the debris? Lovell No, pieces.That is all…
  • p. 61 …LoveJl Frank thought it was in the reef ed con<lition for 3 months . Borman It…
  • p. 64 …Meanwhile , Frank ' s got the checklist out and the guys out there are putting on the…
  • p. 83 …Lovell We might mention here that both Frank and I think making adjust maneuvers without a…
  • p. 90 …We had no problems with air flow. :Borman It would have been a very, very difficult…
  • p. 93 …When I was out of the suit and Frank was in it, we put my suit…
  • p. 118 …Lovell Frank's was better than mine. Whenever I could I would give him the cameras…
  • p. 125 …Lovell It was a necessary evil, Frank. Borman We were a little concerned when we opened…
  • p. 141 131 Borman The reception on HF during the fl i ght was very poor. Lovell Right…
  • p. 172 …Lovell The magnitude of this laser is a lot less than either Frank or I suspected…
Lovell
Bonnan
Lovell
Bom"'n
J,ove) 1
Borman
Lovell
"'Borman
T,ovell
That ' s a minus 1 error here, r ight? And a pJus 2 error
there, right?
Right.
Okay , so I went in here and got to a plus 2 error here,
right ?
fl ight .
Wp..nt up here to a minus , here ' s the zero mark right her e,
to a minus one error ; where this thing crossed this thing
right np to here , plus 2, and by eosh, it came right out to
50 degrees or s3 degrees .
They gave ue 55 degrees roll l eft, which is what the nomi
nal l evel was . ..
I ' ve got i t right here . Fi fty degrees and 60 deGrees is
what they gave us . Bank l eft 50 degrees and bank right
60 deerees.
Yes .
~n~ so I looked up the ch~rt and it said 50 QeP,rees as t~e
b~ck uu angl es--everything was working just l ike a charm
anrt then I went back here to the ban k contonr line to get
out our down range defl ection , and it was 1 or 2 miles , I ·
think it was , no , 5 mil es overshoot ; which w~s just ahout
as cl ose as you can hack it . And I t hought oh boy, this
t■ realJy , talk about nominRl reentry , this is the one

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is under it. 222 pages are in the text index: search them above, or from the library's search.