Documents / Official release

Gemini 7 Technical Debriefing, 1965

National Aeronautics and Space Administration · 1965 · 222 pages · text from the file's own layer

This is a preliminary transcript of the Gemini 7 technical debriefing, dated December 23, 1965, from the National Aeronautics and Space Administration. It was made from tape recordings of the crew debriefing held December 19 to 21, 1965 at the Crew Quarters, Cape Kennedy, Florida. In it, Frank Borman and Jim Lovell go through countdown, powered flight, insertion, station keeping with the booster, systems, experiments and training. The table of contents also lists a section on visual sightings during orbital flight.

From the source:Release of 2026-06-12 Incident: December 19-21, 1965, Cape Kennedy, Florida. This document is a preliminary transcript derived from voice recordings of the Gemini 7 flight crew debriefing conducted December 19-21, 1965, at the Crew Quarters, Cape Kennedy, Florida. Lights and flashes are mentioned and there is discussion about having proper illumination for vehicle docking. Borman and Lovell discuss celestial and terrestrial observational anomalies and note sightings of Mercury, meteors, aurora, and lightning. They also discuss not being able to see any stars once the Sun comes up.

  • p. 25 15 Borman Could you identify any type of the debris? Lovell No, pieces.That is all…
  • p. 61 …LoveJl Frank thought it was in the reef ed con<lition for 3 months . Borman It…
  • p. 64 …Meanwhile , Frank ' s got the checklist out and the guys out there are putting on the…
  • p. 83 …Lovell We might mention here that both Frank and I think making adjust maneuvers without a…
  • p. 90 …We had no problems with air flow. :Borman It would have been a very, very difficult…
  • p. 93 …When I was out of the suit and Frank was in it, we put my suit…
  • p. 118 …Lovell Frank's was better than mine. Whenever I could I would give him the cameras…
  • p. 125 …Lovell It was a necessary evil, Frank. Borman We were a little concerned when we opened…
  • p. 141 131 Borman The reception on HF during the fl i ght was very poor. Lovell Right…
  • p. 172 …Lovell The magnitude of this laser is a lot less than either Frank or I suspected…
32
inches in diameter at the exit from the water boiler vent.
Lovell There were only two problems that we really had. There
were the Fuel Cella and the two thrusters. We also had a
cold Spacecraft.
Borman Yes, that is when we had that water boiler problem.
Lovell Before that; the first time we woke up, it was 20 degrees
oolder inside.
Borma.n Oh yes, I'm sure what had happened du.ri ng the night was
that we vented the water boiler, used the water boiler.
This is the day when we woke up and had such high rates
o.n the S/C. We have all that in the cabin temperature
survey. The wall temperature was 20 degrees lower.
Lovell It was just freezing in there.
5.0 REIBOFIRE
5.1 TR-2:00 Power Up and Alignment Checklist
Borman We had a slightl y different procedure as far as retrofire
goes. Powering up for i t took two hours. The power up
and alignment checklist was called up from the ground
since we had open circuited two stacks. We turned our
ma.in batteries on and the squib batteries back on at TR
minus two hours.
Lovell During the flight they had powered us down on the squib
batteries and put in the bus ties about the l ast week of the