This is a preliminary transcript of the Gemini 7 technical debriefing, dated December 23, 1965, from the National Aeronautics and Space Administration. It was made from tape recordings of the crew debriefing held December 19 to 21, 1965 at the Crew Quarters, Cape Kennedy, Florida. In it, Frank Borman and Jim Lovell go through countdown, powered flight, insertion, station keeping with the booster, systems, experiments and training. The table of contents also lists a section on visual sightings during orbital flight.

From the source:Release of 2026-06-12 Incident: December 19-21, 1965, Cape Kennedy, Florida. This document is a preliminary transcript derived from voice recordings of the Gemini 7 flight crew debriefing conducted December 19-21, 1965, at the Crew Quarters, Cape Kennedy, Florida. Lights and flashes are mentioned and there is discussion about having proper illumination for vehicle docking. Borman and Lovell discuss celestial and terrestrial observational anomalies and note sightings of Mercury, meteors, aurora, and lightning. They also discuss not being able to see any stars once the Sun comes up.

  • p. 25 15 Borman Could you identify any type of the debris? Lovell No, pieces.That is all…
  • p. 61 …LoveJl Frank thought it was in the reef ed con<lition for 3 months . Borman It…
  • p. 64 …Meanwhile , Frank ' s got the checklist out and the guys out there are putting on the…
  • p. 83 …Lovell We might mention here that both Frank and I think making adjust maneuvers without a…
  • p. 90 …We had no problems with air flow. :Borman It would have been a very, very difficult…
  • p. 93 …When I was out of the suit and Frank was in it, we put my suit…
  • p. 118 …Lovell Frank's was better than mine. Whenever I could I would give him the cameras…
  • p. 125 …Lovell It was a necessary evil, Frank. Borman We were a little concerned when we opened…
  • p. 141 131 Borman The reception on HF during the fl i ght was very poor. Lovell Right…
  • p. 172 …Lovell The magnitude of this laser is a lot less than either Frank or I suspected…
25
work we did without suits on.
Lovell Right. We took the s/c out of the horizon at 2:08 to get
some measurements,as requested fro.m DOD,after we measured
the stars. This is after we powered down the equipment.
We connected the bypass hoses at 2:32. This was 2 hours
plus 32 minutes.
Lovell Crew status reports. We bad 3 or 4 a day.
Borman 5:20,we started unpacking the meals. This is one thing
that we had trouble with• lbth left and right food boxes
were jam packed. Fortunately ,we changed the lanyards. v,e
changed this during our stowage review , &lthough it was
difficult we got them out. Several of the meals had lost
vacuum.
Lovell Which .made them more difficult to get out.
Borman Really you can't co.mplain about this. The people did the
best they could. We had an awful lot of food to store
and we were able to get them out.
Lovell We had several blinkinge of the Delta Plight during this
period. It went out at 6 hours, a littleleas t han 6 hours,
then came back on again at 6:27.
Borman One thing that I wanted to find out a.bout,and I still don't
understand,is why we turned on the crossfeed valve right
after l&:w\oh. The FC o2 pressure was just on the minit11.Um