Documents / Official release

Gemini 7 Technical Debriefing, 1965

National Aeronautics and Space Administration · 1965 · 222 pages · text from the file's own layer

This is a preliminary transcript of the Gemini 7 technical debriefing, dated December 23, 1965, from the National Aeronautics and Space Administration. It was made from tape recordings of the crew debriefing held December 19 to 21, 1965 at the Crew Quarters, Cape Kennedy, Florida. In it, Frank Borman and Jim Lovell go through countdown, powered flight, insertion, station keeping with the booster, systems, experiments and training. The table of contents also lists a section on visual sightings during orbital flight.

From the source:Release of 2026-06-12 Incident: December 19-21, 1965, Cape Kennedy, Florida. This document is a preliminary transcript derived from voice recordings of the Gemini 7 flight crew debriefing conducted December 19-21, 1965, at the Crew Quarters, Cape Kennedy, Florida. Lights and flashes are mentioned and there is discussion about having proper illumination for vehicle docking. Borman and Lovell discuss celestial and terrestrial observational anomalies and note sightings of Mercury, meteors, aurora, and lightning. They also discuss not being able to see any stars once the Sun comes up.

  • p. 25 15 Borman Could you identify any type of the debris? Lovell No, pieces.That is all…
  • p. 61 …LoveJl Frank thought it was in the reef ed con<lition for 3 months . Borman It…
  • p. 64 …Meanwhile , Frank ' s got the checklist out and the guys out there are putting on the…
  • p. 83 …Lovell We might mention here that both Frank and I think making adjust maneuvers without a…
  • p. 90 …We had no problems with air flow. :Borman It would have been a very, very difficult…
  • p. 93 …When I was out of the suit and Frank was in it, we put my suit…
  • p. 118 …Lovell Frank's was better than mine. Whenever I could I would give him the cameras…
  • p. 125 …Lovell It was a necessary evil, Frank. Borman We were a little concerned when we opened…
  • p. 141 131 Borman The reception on HF during the fl i ght was very poor. Lovell Right…
  • p. 172 …Lovell The magnitude of this laser is a lot less than either Frank or I suspected…
190
Lovell Retrofires procedure-wise was very good. The
horizon, visual display, really is a big item.
It made all the difference in the world between
what we had before with no display and what we have
now. As far as training goes, that is a very big item.
The Houston Simulator ought to have a visual display
as soon as possible. Retrofire reentries were all as
programmed.
Borman We had visual at RoustonJ we just did not have the
targets. We had the stare at night.
Lovell We had the stars, but we had the occluding disc,
and we did not have the horizon.
Borman Reentry on the Mission Simulator was good, a very
close approximation to what we flew in the spacecraft.
I think that was very valuable. On GT-4, we had
only flown about two or three reentries. We had
to go up to St. Louis to fly these.
Lovell GT-3 and GT-4 were both that way. Essentially what
we are saying about the Gemini Mission Simulator at
Houston is that it is the basic trainer for systems an:l
procedures. The one at the Cape is a fine mock-up for the
final flight plan simulator. We go right through

About this file