Documents / Official release

Gemini 7 Technical Debriefing, 1965

National Aeronautics and Space Administration · 1965 · 222 pages · text from the file's own layer

This is a preliminary transcript of the Gemini 7 technical debriefing, dated December 23, 1965, from the National Aeronautics and Space Administration. It was made from tape recordings of the crew debriefing held December 19 to 21, 1965 at the Crew Quarters, Cape Kennedy, Florida. In it, Frank Borman and Jim Lovell go through countdown, powered flight, insertion, station keeping with the booster, systems, experiments and training. The table of contents also lists a section on visual sightings during orbital flight.

From the source:Release of 2026-06-12 Incident: December 19-21, 1965, Cape Kennedy, Florida. This document is a preliminary transcript derived from voice recordings of the Gemini 7 flight crew debriefing conducted December 19-21, 1965, at the Crew Quarters, Cape Kennedy, Florida. Lights and flashes are mentioned and there is discussion about having proper illumination for vehicle docking. Borman and Lovell discuss celestial and terrestrial observational anomalies and note sightings of Mercury, meteors, aurora, and lightning. They also discuss not being able to see any stars once the Sun comes up.

  • p. 25 15 Borman Could you identify any type of the debris? Lovell No, pieces.That is all…
  • p. 61 …LoveJl Frank thought it was in the reef ed con<lition for 3 months . Borman It…
  • p. 64 …Meanwhile , Frank ' s got the checklist out and the guys out there are putting on the…
  • p. 83 …Lovell We might mention here that both Frank and I think making adjust maneuvers without a…
  • p. 90 …We had no problems with air flow. :Borman It would have been a very, very difficult…
  • p. 93 …When I was out of the suit and Frank was in it, we put my suit…
  • p. 118 …Lovell Frank's was better than mine. Whenever I could I would give him the cameras…
  • p. 125 …Lovell It was a necessary evil, Frank. Borman We were a little concerned when we opened…
  • p. 141 131 Borman The reception on HF during the fl i ght was very poor. Lovell Right…
  • p. 172 …Lovell The magnitude of this laser is a lot less than either Frank or I suspected…
10
:::action 2 delta Plight did not go out a.nd it was •••
Lovell No, J:ection 1 went on and out again during the £light. It
went out at, I think it went out at SECO.
Borman That is right.
Lovell But 'Section 2 came on and we saw that one £or the next 14
days.
2.20 Acceleration
Borman Acceleration during stage 2 was right on the money, right on
the program. I read of£, I think i t was about six a.nd a
I
half g a maximum. We read this off after SECO.
2.21 Fairing Jettison
Borman Fairing Jettison, I did not even hear it. I was concentra
ting on the horizon , trying to get set for turning around.
Jim j ettisoned the fairing and punched the Spacecraft SEP.
I did not see a.nything or hear a.nything.
Lovell I saw debris and heard it and had a definite knowledge that
a squib had gone off. There had been an explosion.
3.0 INSERTION
3.1 Post SECO
Borman Maneuver controller was easy to reach. I had it out, and
there was no problem. It came out and was ready to go.
Attitudes and rates, there were none. The thing was as
solid a.a a rock as far as I could determine. I was watching

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is above. 222 pages are in the text index: search them above, or from the library's search.