This is a preliminary transcript of the Gemini 7 technical debriefing, dated December 23, 1965, from the National Aeronautics and Space Administration. It was made from tape recordings of the crew debriefing held December 19 to 21, 1965 at the Crew Quarters, Cape Kennedy, Florida. In it, Frank Borman and Jim Lovell go through countdown, powered flight, insertion, station keeping with the booster, systems, experiments and training. The table of contents also lists a section on visual sightings during orbital flight.

From the source:Release of 2026-06-12 Incident: December 19-21, 1965, Cape Kennedy, Florida. This document is a preliminary transcript derived from voice recordings of the Gemini 7 flight crew debriefing conducted December 19-21, 1965, at the Crew Quarters, Cape Kennedy, Florida. Lights and flashes are mentioned and there is discussion about having proper illumination for vehicle docking. Borman and Lovell discuss celestial and terrestrial observational anomalies and note sightings of Mercury, meteors, aurora, and lightning. They also discuss not being able to see any stars once the Sun comes up.

  • p. 6 14.0 TRAINI NG 14.1 Gemini Missi on Simulator ...........•••••••185 14. 2 DCPS (Launch abort…
  • p. 86 than the 4-C suit, but mobility in the Gemini cockpit with the 5-C suit…
  • p. 200 …GT-4 were both that way. Essentially what we are saying about the Gemini Mission Simulator…
  • p. 215 …since we had rotated so early from Gemini 4, that we could have eliminated that and…
178
Lovell
Borman
Lovell
Borman
Lovell
Borman
Lovell
Borman
Lovell
Borman
Lovell
When we were first introduced to the equipment back at the
stowage review up at St. Louis, we didn't lmow enough about
the experiment to really analyze the equipment, to find out
whether it would be adequate or not.
That is right. We should have. picked up the reticle light
ing on that.
Because we did not pick up the reticle lighting and we did
not pick up the green filter.
No. The green filter looked all right when we used it on
the ground. It is just the fact that we were not able to
observe .from .far enough a~ to pick it up.
That is right.
The lighting contrast ... • ..
Also, experiments to the M-1 experiment was sort of a last
minute glitch.
Yes.
We had a lot of compromise. Not compromise but a lot of
failures.
Putting the M-1 into the ECS system you mean.
AlthoulJh, I will have to admit that the whole thing worked
out fine. The mechanics of the M-1 experiment did l ast
14 ~sand was absolutely no problem as far as operation of
spacecraft or the ECS system.