Documents / Official release

Gemini 7 Technical Debriefing, 1965

National Aeronautics and Space Administration · 1965 · 222 pages · text from the file's own layer

This is a preliminary transcript of the Gemini 7 technical debriefing, dated December 23, 1965, from the National Aeronautics and Space Administration. It was made from tape recordings of the crew debriefing held December 19 to 21, 1965 at the Crew Quarters, Cape Kennedy, Florida. In it, Frank Borman and Jim Lovell go through countdown, powered flight, insertion, station keeping with the booster, systems, experiments and training. The table of contents also lists a section on visual sightings during orbital flight.

From the source:Release of 2026-06-12 Incident: December 19-21, 1965, Cape Kennedy, Florida. This document is a preliminary transcript derived from voice recordings of the Gemini 7 flight crew debriefing conducted December 19-21, 1965, at the Crew Quarters, Cape Kennedy, Florida. Lights and flashes are mentioned and there is discussion about having proper illumination for vehicle docking. Borman and Lovell discuss celestial and terrestrial observational anomalies and note sightings of Mercury, meteors, aurora, and lightning. They also discuss not being able to see any stars once the Sun comes up.

  • p. 25 15 Borman Could you identify any type of the debris? Lovell No, pieces.That is all…
  • p. 61 …LoveJl Frank thought it was in the reef ed con<lition for 3 months . Borman It…
  • p. 64 …Meanwhile , Frank ' s got the checklist out and the guys out there are putting on the…
  • p. 83 …Lovell We might mention here that both Frank and I think making adjust maneuvers without a…
  • p. 90 …We had no problems with air flow. :Borman It would have been a very, very difficult…
  • p. 93 …When I was out of the suit and Frank was in it, we put my suit…
  • p. 118 …Lovell Frank's was better than mine. Whenever I could I would give him the cameras…
  • p. 125 …Lovell It was a necessary evil, Frank. Borman We were a little concerned when we opened…
  • p. 141 131 Borman The reception on HF during the fl i ght was very poor. Lovell Right…
  • p. 172 …Lovell The magnitude of this laser is a lot less than either Frank or I suspected…
175
12.1
Lovell
Borman
Lovell
Borman
Lovell
12 . 2
Borman
12 . 0 PREMISSI0N PL.ANNING
Mission Plan (Tra,jectory)
Well , of course, it varies here , this is the last.
It changed. We had o.ne all wired and writte.n up £'or a. 72
degree launch azi muth and this changed with the addition
of the GT- 6 mission. But I thought the people were very
f lexible, and adapt ed rapi dly to the change.
Well, ~e are talking about the mis sion plan , and they
a:re talking about the trajectory alone. There is no
doubt about it t hat our mission , as origina lly set up
for our fuel , was adequate. But ,when we introduced GT-6
and the rendezvous mission, the a.mount of experimental
work which we had to do also was not reduced at all .
This compromised the results of our experimental work by
having to use the fuel for the rendezvous . Although ,
I think the rendezvous was i mportant , or t hat it was
higher priority, I would like to have it put on the
record, that the results we gathered from the rest of the
flight were not as good as could be expected, because of
the fact that we just did not have the fuel.
110 pounds of gas went down the drain, too.
Yes.
Flight Plan
I thought the people did a great job there.

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is above. 222 pages are in the text index: search them above, or from the library's search.