Gemini 7 Technical Debriefing, 1965

National Aeronautics and Space Administration · 1965 · 222 pages · text from the file's own layer

This is a preliminary transcript of the Gemini 7 technical debriefing, dated December 23, 1965, from the National Aeronautics and Space Administration. It was made from tape recordings of the crew debriefing held December 19 to 21, 1965 at the Crew Quarters, Cape Kennedy, Florida. In it, Frank Borman and Jim Lovell go through countdown, powered flight, insertion, station keeping with the booster, systems, experiments and training. The table of contents also lists a section on visual sightings during orbital flight.

From the source:Release of 2026-06-12 Incident: December 19-21, 1965, Cape Kennedy, Florida. This document is a preliminary transcript derived from voice recordings of the Gemini 7 flight crew debriefing conducted December 19-21, 1965, at the Crew Quarters, Cape Kennedy, Florida. Lights and flashes are mentioned and there is discussion about having proper illumination for vehicle docking. Borman and Lovell discuss celestial and terrestrial observational anomalies and note sightings of Mercury, meteors, aurora, and lightning. They also discuss not being able to see any stars once the Sun comes up.

  • p. 25 15 Borman Could you identify any type of the debris? Lovell No, pieces.That is all…
  • p. 61 …LoveJl Frank thought it was in the reef ed con<lition for 3 months . Borman It…
  • p. 64 …Meanwhile , Frank ' s got the checklist out and the guys out there are putting on the…
  • p. 83 …Lovell We might mention here that both Frank and I think making adjust maneuvers without a…
  • p. 90 …We had no problems with air flow. :Borman It would have been a very, very difficult…
  • p. 93 …When I was out of the suit and Frank was in it, we put my suit…
  • p. 118 …Lovell Frank's was better than mine. Whenever I could I would give him the cameras…
  • p. 125 …Lovell It was a necessary evil, Frank. Borman We were a little concerned when we opened…
  • p. 141 131 Borman The reception on HF during the fl i ght was very poor. Lovell Right…
  • p. 172 …Lovell The magnitude of this laser is a lot less than either Frank or I suspected…
159
pictures over Brazil that have never been gotten before.
They were not called up. We took them with the IR color
shifted .f i l m. We go t s ome pictures of Mexi c o t hat
were not ca lled up.
Lovel l We ·got a good sequence over North Africa.
Borman We got s everal good sequences over North Africa..
Lovell But I am sure tha.t they have been used before.
Borman We a l so took a seque.nce a l ong the southern coast from
New Orleans through Fl ori da using color shifted I R t o
eval uate t he f ilm more than anythi ng e l se. I hope this
comes in handy. We got some shots of the is l and chai ns
off Florida, to see if they can determine any effect from
the hurri cane that went through, Betsy.
Lovell As a matter of f act, we got a strip s equence of Cuba too .
Borman Al l these are target s of opportunity done without atti tude
control , but they were all targets that were listed before
f l ight. We got the mouth of the Amazon, and I think that
i s the firs t time t hat has been photographed.
Now on the S-6 the weather photography we tried in
the l ast pa.ss to ta.ke a successive revo l ution picture of
weather devel opment. Ve got one good shot over the
Andee. We a l so got some good shots of wave c l ouds over
the Andes during the l atter part of the flight. We
l ooked for hurricane or tropical storm Alice in the

About this file