Documents / Official release

Gemini 7 Technical Debriefing, 1965

National Aeronautics and Space Administration · 1965 · 222 pages · text from the file's own layer

This is a preliminary transcript of the Gemini 7 technical debriefing, dated December 23, 1965, from the National Aeronautics and Space Administration. It was made from tape recordings of the crew debriefing held December 19 to 21, 1965 at the Crew Quarters, Cape Kennedy, Florida. In it, Frank Borman and Jim Lovell go through countdown, powered flight, insertion, station keeping with the booster, systems, experiments and training. The table of contents also lists a section on visual sightings during orbital flight.

From the source:Release of 2026-06-12 Incident: December 19-21, 1965, Cape Kennedy, Florida. This document is a preliminary transcript derived from voice recordings of the Gemini 7 flight crew debriefing conducted December 19-21, 1965, at the Crew Quarters, Cape Kennedy, Florida. Lights and flashes are mentioned and there is discussion about having proper illumination for vehicle docking. Borman and Lovell discuss celestial and terrestrial observational anomalies and note sightings of Mercury, meteors, aurora, and lightning. They also discuss not being able to see any stars once the Sun comes up.

  • p. 25 15 Borman Could you identify any type of the debris? Lovell No, pieces.That is all…
  • p. 61 …LoveJl Frank thought it was in the reef ed con<lition for 3 months . Borman It…
  • p. 64 …Meanwhile , Frank ' s got the checklist out and the guys out there are putting on the…
  • p. 83 …Lovell We might mention here that both Frank and I think making adjust maneuvers without a…
  • p. 90 …We had no problems with air flow. :Borman It would have been a very, very difficult…
  • p. 93 …When I was out of the suit and Frank was in it, we put my suit…
  • p. 118 …Lovell Frank's was better than mine. Whenever I could I would give him the cameras…
  • p. 125 …Lovell It was a necessary evil, Frank. Borman We were a little concerned when we opened…
  • p. 141 131 Borman The reception on HF during the fl i ght was very poor. Lovell Right…
  • p. 172 …Lovell The magnitude of this laser is a lot less than either Frank or I suspected…
129
Borman Certainly this factor of weather l eads me to believe that
the whole idea of na:vigating Apollo by a landmark needs t o
be reevaluated. It seems to me that a much more desirable
feature woul d be a series of radar beacons placed throughout
the world, similar to the ones that are used by SAC, or some
type of electronic gadget not dependent upon cl ear weather.
You cannot choose the weather you want, and in our f ourtee.n
day mission, for about el even days we had lousy weather.
The number of primary targ~ts photographed. How many did
you photograph?
Lovell We have nine Apollo l andmarks logged in the Apollo land.mark
section:
Sequence 85 - clouds at nadir.
Sequence 137 - no luck, clouds overhead.
Sequence 94 - unable, because of c~0uds. Took a point of
land nearby.
Sequence 58 - Cloudy.
Sequence 70 - Okay.
Sequence 85 - Just weather is the remark.
Sequence 108 - Clouds, resulting in poor picture .
Sequence 130 - Weather.
Sequence 97 - Weather.
Most of the l andmarks they gave us, that were down below
the 15 degrees north l atitude ended up with weather.

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is above. 222 pages are in the text index: search them above, or from the library's search.