Documents / Official release

Gemini 7 Technical Debriefing, 1965

National Aeronautics and Space Administration · 1965 · 222 pages · text from the file's own layer

This is a preliminary transcript of the Gemini 7 technical debriefing, dated December 23, 1965, from the National Aeronautics and Space Administration. It was made from tape recordings of the crew debriefing held December 19 to 21, 1965 at the Crew Quarters, Cape Kennedy, Florida. In it, Frank Borman and Jim Lovell go through countdown, powered flight, insertion, station keeping with the booster, systems, experiments and training. The table of contents also lists a section on visual sightings during orbital flight.

From the source:Release of 2026-06-12 Incident: December 19-21, 1965, Cape Kennedy, Florida. This document is a preliminary transcript derived from voice recordings of the Gemini 7 flight crew debriefing conducted December 19-21, 1965, at the Crew Quarters, Cape Kennedy, Florida. Lights and flashes are mentioned and there is discussion about having proper illumination for vehicle docking. Borman and Lovell discuss celestial and terrestrial observational anomalies and note sightings of Mercury, meteors, aurora, and lightning. They also discuss not being able to see any stars once the Sun comes up.

  • p. 25 15 Borman Could you identify any type of the debris? Lovell No, pieces.That is all…
  • p. 61 …LoveJl Frank thought it was in the reef ed con<lition for 3 months . Borman It…
  • p. 64 …Meanwhile , Frank ' s got the checklist out and the guys out there are putting on the…
  • p. 83 …Lovell We might mention here that both Frank and I think making adjust maneuvers without a…
  • p. 90 …We had no problems with air flow. :Borman It would have been a very, very difficult…
  • p. 93 …When I was out of the suit and Frank was in it, we put my suit…
  • p. 118 …Lovell Frank's was better than mine. Whenever I could I would give him the cameras…
  • p. 125 …Lovell It was a necessary evil, Frank. Borman We were a little concerned when we opened…
  • p. 141 131 Borman The reception on HF during the fl i ght was very poor. Lovell Right…
  • p. 172 …Lovell The magnitude of this laser is a lot less than either Frank or I suspected…
116
thermometer. We had a lot of glass in the cockpit. I do
not see why we cannot carry some sort of a plastic thermo
meter. It seems ridiculous to me to have to TM a temperature,
Borman I must admit I did not even know I had a blood pressure cuff
on except when I filled it up. It did not cause any skin
problems or anything. It is probably as good a way as we
can go.
Lovell It seemed like I pumped up nzy- cuff a lot more inflight than
I had to on the ground for the same measurement. Sometimes
we would not get the comment that, your "cuff is full" from
the ground until after your arm was quite puffed up. Some
times your arm really got to be sore. I do not know what
you can do about it.
Borman We used the M-3 equipment not only for the medical or the
crew status passes, but we used it regularly three times a
day. It is a very valuable piece of equipment. It ca.me in
very handy and it certainly was useful for this reason.
guess there is some reason for it for medical data. I did
not understand why we could not stow it the last day. We
had already checked and they sai d, "All right, go ahead and
stow it, you do not need it." Later they said, "You have to
unstow it. We want to get one more pass on you the last
morning of the flight." After 14 days of flight I did not
understand why we needed it, but we did it. Jim left it out,
I

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is above. 222 pages are in the text index: search them above, or from the library's search.