Documents / Official release

Gemini 7 Technical Debriefing, 1965

National Aeronautics and Space Administration · 1965 · 222 pages · text from the file's own layer

This is a preliminary transcript of the Gemini 7 technical debriefing, dated December 23, 1965, from the National Aeronautics and Space Administration. It was made from tape recordings of the crew debriefing held December 19 to 21, 1965 at the Crew Quarters, Cape Kennedy, Florida. In it, Frank Borman and Jim Lovell go through countdown, powered flight, insertion, station keeping with the booster, systems, experiments and training. The table of contents also lists a section on visual sightings during orbital flight.

From the source:Release of 2026-06-12 Incident: December 19-21, 1965, Cape Kennedy, Florida. This document is a preliminary transcript derived from voice recordings of the Gemini 7 flight crew debriefing conducted December 19-21, 1965, at the Crew Quarters, Cape Kennedy, Florida. Lights and flashes are mentioned and there is discussion about having proper illumination for vehicle docking. Borman and Lovell discuss celestial and terrestrial observational anomalies and note sightings of Mercury, meteors, aurora, and lightning. They also discuss not being able to see any stars once the Sun comes up.

  • p. 25 15 Borman Could you identify any type of the debris? Lovell No, pieces.That is all…
  • p. 61 …LoveJl Frank thought it was in the reef ed con<lition for 3 months . Borman It…
  • p. 64 …Meanwhile , Frank ' s got the checklist out and the guys out there are putting on the…
  • p. 83 …Lovell We might mention here that both Frank and I think making adjust maneuvers without a…
  • p. 90 …We had no problems with air flow. :Borman It would have been a very, very difficult…
  • p. 93 …When I was out of the suit and Frank was in it, we put my suit…
  • p. 118 …Lovell Frank's was better than mine. Whenever I could I would give him the cameras…
  • p. 125 …Lovell It was a necessary evil, Frank. Borman We were a little concerned when we opened…
  • p. 141 131 Borman The reception on HF during the fl i ght was very poor. Lovell Right…
  • p. 172 …Lovell The magnitude of this laser is a lot less than either Frank or I suspected…
95
with Spacecraft 6 in the air, I thought went very well. It
posed no problems. Communications Controls &nd Switches
Voice Control Center, Audio modes, Keying and Antenna Selec
tion, were all nominal. We might mention in Sleep Configu
ration--we never used the Sleep switches bees.use we had the
situation where we pretended it was night and went to sleep
every evening and the ground never call ed us. I don't think
they ever violated that for the 14 days. They never called
us during the sleep period.
Lovell So that worked very well.
Borman Beacon Control was no problem. We didn't use the Reentry
C-band Beacon until reentry. The TM controls, tr8Jlsmitter,
and antenna again were no problem. It was operated just a.a
advertised due to all instructions from the ground.
8.6 Electrical
Borman Now we have some interesting things to talk about.
Lovell Well, we monitored the electrical system pretty closely.
Borma.n Yea.h, I guess we did.
Lovell The only thing we can say here is reiterate what we have
probably said before. On lift-off we had delta Plights
come on for fuel cells--both sections. 1 blinked on and
off several times and went off. 2 blinked on and off
several times and stayed on through insertion and stayed on

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is under it. 222 pages are in the text index: search them above, or from the library's search.