Documents / Official release
Gemini 7 Technical Debriefing, 1965
National Aeronautics and Space Administration · 1965 · 222 pages · text from the file's own layer
This is a preliminary transcript of the Gemini 7 technical debriefing, dated December 23, 1965, from the National Aeronautics and Space Administration. It was made from tape recordings of the crew debriefing held December 19 to 21, 1965 at the Crew Quarters, Cape Kennedy, Florida. In it, Frank Borman and Jim Lovell go through countdown, powered flight, insertion, station keeping with the booster, systems, experiments and training. The table of contents also lists a section on visual sightings during orbital flight.
From the source:Release of 2026-06-12 Incident: December 19-21, 1965, Cape Kennedy, Florida. This document is a preliminary transcript derived from voice recordings of the Gemini 7 flight crew debriefing conducted December 19-21, 1965, at the Crew Quarters, Cape Kennedy, Florida. Lights and flashes are mentioned and there is discussion about having proper illumination for vehicle docking. Borman and Lovell discuss celestial and terrestrial observational anomalies and note sightings of Mercury, meteors, aurora, and lightning. They also discuss not being able to see any stars once the Sun comes up.
“Borman”60+ pages
- p. 11 ....
1.0 COUNTDOWN
1.1 Crew Insertion
Borman I have no comment. I thought it went…
- p. 12 2
1.5 ECS
Borman ECS worked fine. We had no trouble with ECS at all…
- p. 13 …2 .0 POWERED FLIGHT
2.1 Liftoff Cues
Borman Stoney came in loud e.nd c…
- p. 14 …2.2 Roll Program
Borman The roll program, was so short it was almost like a…
- p. 15 …2.4 Aerodynamic
Borman Age.in, we had had this described to us ma.ny times…
- p. 16 6
2.7 Wind shear
Borman Wind s hear. I did not notice any.
Lovell I…
- p. 17 7
Lovell
Borman
Borman
Lovell
Borma.n
Borman
Lovell
I did not notice any POGO.
2…
- p. 18 …2.14 BECO
Borman At BECO, the whole spacecraft was engulfed in a red flame .
I…
- p. 19 9
Eorma.n
Lovell
:Borman
:Borman
Lovell
:Borman
Borman
Lovell
:Borman
that particul ar time.
2…
- p. 20 …2.20 Acceleration
Borman Acceleration during stage 2 was right on the money, right on
the…
- p. 21 …Lovell Okay.
:Borman In fact, I did not use the thrusters at all for that. I…
- p. 22 12
Borman 17, 30, and 20. There might have been a 13, 17, a.nd 20…
- p. 23 …the
primary station. The UHF was outstanding.
Borman We have already discussed GO/NO GO. They…
- p. 24 …to men
tion that address 72 read --
Borman Nominal was 25 804 and address 72 read…
- p. 25 15
Borman Could you identify any type of the debris?
Lovell No, pieces.That is all…
- p. 26 16
:Borman We were looking right into the sun; I hope they do too. The
drogu…
- p. 27 …3.4 Post station-keeping
Borman We did not do anything with stowage on the first…
- p. 29 …We actv.ally separa
ted at 00:-21.
:Borman That is right. So we separated because…
- p. 30 …you cannot tell from a
flashing light.
Borman Especially on vehicles rotating. I do not think…
- p. 31 …powered down and then waited two hours?
:Borman Tha t is right . This is one of…
- p. 33 …more because we were still at ~ ogee.
Borman The first a:f many powerdowns was no…
- p. 34 …have a lot of comments on it.
Borman Let's start from the beginning.
Lovell The…
- p. 35 …We bad 3 or 4 a day.
Borman 5:20,we started unpacking the meals. This…
- p. 36 …wanted to pump up and make sure.
Borman It worked fine and we got right back…
- p. 37 …also i sometrics three times
a day.
Borman They were programmed 10 minutes. I think a…
- p. 38 28
Borman At 49t53 we got a picture of Houston with the 250 .mm l ens…
- p. 39 …wonder really if it was worth it.
Borman At about 166,40 we noted our drift…
- p. 40 …Lovell Yes, I know, I just thought :maybe we could hear it or
so.mething.
:Borman…
- p. 41 …Apollo landmarks were shot because of clouds.
Borman On the 6 l auncht the second ti…
- p. 42 …5.0 REIBOFIRE
5.1 TR-2:00 Power Up and Alignment Checklist
Borman We had…
- p. 43 33
fl i ght.
Borman We were flying with bus ties and tu.el cells and…
- p. 44 . 34
:Borman
Lovell
:Borman
Lovell
:Sorms..n
Lovel l
:Borm&n
:Sorman
Lovell
:Sorman
Lovell
5…
- p. 45 35
Borman Yes, and you really fee l SEP ADAP'l'. It felt like I had…
- p. 46 …used to zero g fl i ght.
Borman The only thing I could do was fly…
- p. 47 37
Borman
• Lovell
BormA.n
Lovell
Borman
Lovell
'Borman
Lovel 1
Borman
Sheparn.
Lovell
l3omP.n…
- p. 48 Lovell
Bonnan
Lovell
Bom"'n
J,ove) 1
Borman
Lovell
"'Borman
T,ovell
That ' s a…
- p. 49 …s t or;y w?. s there.
Borman 'P.;e :-'DI as .fA.r as the…
- p. 51 41
Borman That was right on the money. The retro pack jettison was
accomplished 45 seconds…
- p. 52 …5.10 Post Retro Jettison Checklist
Borman The post retro jettison checklist was accomplished with no…
- p. 53 …find out where the horizon is and- -
Borman That was a heck of a thing. I…
- p. 55 …Because when he was right on.
:Borman You said we were overshooting &11 the time.
Lovell…
- p. 56 Lovell Yes.
Borman During the later part of it I started out in PULSE Mode and…
- p. 57 …3 Aceelera.tio!!,_Pro.file
Borman Okay. The acceleration profile was very smallo It was a…
- p. 58 …6.5 lOOK Feet
Borman I started losing it; I think we may have run out…
- p. 59 49
Borman We'll have to see. We don't have readings on that .
Lovell Okay…
- p. 60 …Why?
Borman I took my hood off to try to find the horizon , so I made…
- p. 61 …reef ed con<lition for 3 months .
Borman It seemed like it s tayed reefed for…
- p. 62 …6.14 2X Checklist
Borman 2,000 foot checklist we accomplished with no problem. About
this…
- p. 63 …were just too hot and too beat .
:Borman It was even hot in the spacecraft, so…
- p. 64 …Lovell We got called up from the MCC
Borman But , anyway, we didn ' t do it…
- p. 65 55
Lovell
Borman
Lovell
Borman
Lovell
BoI'J'llan
Love11
Borman
Lovell
Borman
Lovell
we hit…
- p. 66 …We opened up t he repress valve; di d we have
the cabin fan on?
Borman…
- p. 67 …ay pl anet troubl e or something.
Borman Communi cations wi t h recovery forces on…
- p. 68 58
Lovell
Boman
J.ovel l
Boman
LoveJl
Boman
Lovell
Borman
cross range .
Did you have…
- p. 69 …and 4 dirl not move from zero.
Borman And then you turned off squib batteries land…
- p. 70 …RCS f umes , I do not know.
Borman The main chute was perf ect .
Lovell Looked…
- p. 71 …I did not see a:ny leaks.
Borman Electrical Power: We mentioned we had 1 and…
- p. 72 …6 Postlanding Activity
Borman Postlanding act ivity was well organized. We were a li t t…
- p. 73 …7 Com f ort
Borman It gets pretty wa rm in that sp~cecraft. I would…
- p. 74 …1 Ple.tfom
Borman We aligned the platform 3 t imes. W:ach time it worked…
90
" orma.n Yes ..here it is here•••it was 158 hours a.nd 27 minutes when
we got up, a.nd we had a. wall temperature of 64 degrees and
a. pilot ha.tch temperature of 66 degrees. Comparing this
with 144 hours and 5~ minutes, the hatch temperature had
been 84 degrees, so there was a. 20 degrees drop du.ring this
one evening. ~ I attributed this, plus the fact th.at we no
ticed la.:rge drift rates when we woke up, to the fact that
the water boiler must have been opera.ting during the night.
It was the only time during the flight that we noticed these
large drops in tempera.ture.•. the very cold wall tempera.tures.
We were on double loop, B pumps most of the time. Finally,
went to A pump twice in the flight when people were in the
suits in order to at~ cool. We went to double A pumps, of
course, when we were powered up.
Lovell We bad one time when we bad one A pump on.
:Borman Twice we had it on.
Lovell Twice, but just one primary pump. We did not go to two A
pumps.
l3orma.n No. A pump in the primary loop was on twice to keep cool.
Lovell Right. The second.a.ry loop A pump was not on.
Borman Never on except during periods when the platform we.a running.
Lovell Right.
Borman Now, as I mentioned before, when we were running both B
About this file
Official release, from the pursue collection. The PDF is mirrored here; the original link is under it. 222 pages are in the text index: search them above, or from the library's search.