Documents / Official release

Gemini 5 Technical Debriefing, Part II, 1965

National Aeronautics and Space Administration · 1965 · 325 pages · text from the file's own layer

This is a preliminary Part II transcript of the Gemini 5 (GT-5) flight crew debriefing, prepared by the Spacecraft Operations Branch of NASA's Flight Crew Support Division and dated September 2, 1965. It records astronauts Cooper and Conrad at the Crew Quarters, Cape Kennedy. They discuss how the spacecraft systems worked, including the platform and the OAMS thruster failures. The transcript also covers operational checks, visual sightings, experiments, training, premission planning, and medical aspects. It was originally classified Confidential.

From the source:Release of 2026-06-12 Incident: August 30 - September 2, 1965, Cape Kennedy, Florida. This document is a preliminary transcript (Part II) derived from voice recordings of the Gemini 5 flight crew technical debriefing. NASA conducted this debriefing between August 30, 1965, and September 2, 1965, at the Crew Quarters, Cape Kennedy, Florida. Astronauts L. Gordon Cooper and Charles “Pete” Conrad described observing debris and “snow” and “all sorts of glittering pieces of this, that and the other thing” in the “Visual Sightings” section of the document (pages 157-220).

60
•
made my whole chest and rib area sor E• f rom the
mainfol d , the end i nside the suit being gouged over ,
being cantilevered over and digging in side ways
on me . So , it 's a real pressure point. It was the
worst pressure point I had were from the suit
hoses, and I had my suit hoses deliberatel y longer,,
than people said they should be so I ~ould get away
f rom this effect . So, I di d have sla~k to
prevent ~hem from getting drug over ·but even so
they bothered me. Finger tip lights ·,1ere good and
I kept one glove out and kep t it over on a piece
velcro o,.l t he side to use in the event we had any
kind of cabin light failures. When P(~te was asleep
I frequently used my finger tip lightB on that
glove to light up some of the gages to look around
with. Cabin pressure sealed off high on our gage .
This i s under s ection 2, Cabin. Our CE.bin pressure
a t launch sealed off high a t about 5, 5, which it
always did i n the a t titude chamber in all t he runs
we made, in f ac t , in just exactly the same way.
Then i t bled down slowly t o about 4 , 9 and never
budged from there the whole flight . It stayed
right there . We never saw one flick out of it a t

Not linked to a story yet.

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is above. 325 pages are in the text index: search them above, or from the library's search.