Documents / Official release

Gemini 5 Technical Debriefing, Part II, 1965

National Aeronautics and Space Administration · 1965 · 325 pages · text from the file's own layer

This is a preliminary Part II transcript of the Gemini 5 (GT-5) flight crew debriefing, prepared by the Spacecraft Operations Branch of NASA's Flight Crew Support Division and dated September 2, 1965. It records astronauts Cooper and Conrad at the Crew Quarters, Cape Kennedy. They discuss how the spacecraft systems worked, including the platform and the OAMS thruster failures. The transcript also covers operational checks, visual sightings, experiments, training, premission planning, and medical aspects. It was originally classified Confidential.

From the source:Release of 2026-06-12 Incident: August 30 - September 2, 1965, Cape Kennedy, Florida. This document is a preliminary transcript (Part II) derived from voice recordings of the Gemini 5 flight crew technical debriefing. NASA conducted this debriefing between August 30, 1965, and September 2, 1965, at the Crew Quarters, Cape Kennedy, Florida. Astronauts L. Gordon Cooper and Charles “Pete” Conrad described observing debris and “snow” and “all sorts of glittering pieces of this, that and the other thing” in the “Visual Sightings” section of the document (pages 157-220).

47
FCSD rep
Conrad
Cooper
8 .3 RCS
FCSD rep
Cooper
Conrad
Cooper
FCSD rep
Cooper
FCSD rep
Conrad
Cooper
Cooper
COt~FIDE~~TIAt
OK- well , I don't think there is much we can
add then--did you get all of these readings
out of--
8O- 81- 82- 58- 59- 69- Yeah, that stuff works
just like the simulator. We got the readings .
OK - On to 8 .3 - RCS.
Let's go into the RCS - yeah , I don ' t think
there is anything more--
This is all--
Yeah, this is all we can do on the REP.
OK- RCS Operational Checks - We did just like
we had planned in our little book. We
a ctivated the RCS and Check Ring A and ACME
and direct--al l three axis- Ring B - Check
Ring Bin ACME and direct--all three axis
and they worked beautifully.
How about the pad checks--were they-
Negative
No pad checks?
Not with the sealed system--
A sealed system - I'm glad it was-
Control Modes - We used pulse and we used
horizon scan--
tQEt◄ Ttl<L

Not linked to a story yet.

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is above. 325 pages are in the text index: search them above, or from the library's search.