Documents / Official release

Gemini 5 Technical Debriefing, Part II, 1965

National Aeronautics and Space Administration · 1965 · 325 pages · text from the file's own layer

This is a preliminary Part II transcript of the Gemini 5 (GT-5) flight crew debriefing, prepared by the Spacecraft Operations Branch of NASA's Flight Crew Support Division and dated September 2, 1965. It records astronauts Cooper and Conrad at the Crew Quarters, Cape Kennedy. They discuss how the spacecraft systems worked, including the platform and the OAMS thruster failures. The transcript also covers operational checks, visual sightings, experiments, training, premission planning, and medical aspects. It was originally classified Confidential.

From the source:Release of 2026-06-12 Incident: August 30 - September 2, 1965, Cape Kennedy, Florida. This document is a preliminary transcript (Part II) derived from voice recordings of the Gemini 5 flight crew technical debriefing. NASA conducted this debriefing between August 30, 1965, and September 2, 1965, at the Crew Quarters, Cape Kennedy, Florida. Astronauts L. Gordon Cooper and Charles “Pete” Conrad described observing debris and “snow” and “all sorts of glittering pieces of this, that and the other thing” in the “Visual Sightings” section of the document (pages 157-220).

  • p. 196 …But we were looking at that scr ewy gray- - Well , I 1 11 tell you , we…
  • p. 198 …jumbled and it's a real dim gray area there you ' re going through just for…
  • p. 317 …The gray interior paint flecks off of the guard bars and off several areas of the…
302
15 . 1 Crew Quarters
Cooper
15 . 0 CONCLUDING REMARKS
One comment on the crew area here . I think that the
crew area here is a real good place to stay and that
the kitchen facility we have set up i ~: very worth
while , when a real tight schedule is almost a neces
s i ty . However , the bedrooms are not ~:oundproof at
all. You can hear anything throughout the whole
thing. Any noise at all that goes on, or a tele
vision or radio playing anywhere thr01:.ghout the whole
thing is very easily heard throughout the ent i re
build ing. I say this only because this was one of
t he suggestions that we had before t he place was ever
build , that the bedrooms be soundproofed . This was
based on our old Hangar S experiences . Due to the
fact that heavy construction is going on all the
time , this place is completely useless so far as
daytime sleepi ng. There is no possibility of sleep
around here during the day due to the jackhammers
and construction work goi ng on . So , if any shift
work is going on , I recommend that someone keep them
a motel room, and sleep during the day at the motel
room if you are worki ng night shifts around here and

Not linked to a story yet.

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is above. 325 pages are in the text index: search them above, or from the library's search.