Documents / Official release

Gemini 5 Technical Debriefing, Part II, 1965

National Aeronautics and Space Administration · 1965 · 325 pages · text from the file's own layer

This is a preliminary Part II transcript of the Gemini 5 (GT-5) flight crew debriefing, prepared by the Spacecraft Operations Branch of NASA's Flight Crew Support Division and dated September 2, 1965. It records astronauts Cooper and Conrad at the Crew Quarters, Cape Kennedy. They discuss how the spacecraft systems worked, including the platform and the OAMS thruster failures. The transcript also covers operational checks, visual sightings, experiments, training, premission planning, and medical aspects. It was originally classified Confidential.

From the source:Release of 2026-06-12 Incident: August 30 - September 2, 1965, Cape Kennedy, Florida. This document is a preliminary transcript (Part II) derived from voice recordings of the Gemini 5 flight crew technical debriefing. NASA conducted this debriefing between August 30, 1965, and September 2, 1965, at the Crew Quarters, Cape Kennedy, Florida. Astronauts L. Gordon Cooper and Charles “Pete” Conrad described observing debris and “snow” and “all sorts of glittering pieces of this, that and the other thing” in the “Visual Sightings” section of the document (pages 157-220).

  • p. 1 …NW 91526 GEMINI V j Technical Debriefing Part ~I_I__________________ CLASSIFICAT:ON CHANGE o_ ----.......,,_~ s:..;;...:1…
  • p. 5 CQ t-4 F-1 DEt-4TIAL 12 . 0 PR.EMISSION PLANNING 12.1 Mission Plan…
  • p. 281 270 14,0 TRAINING 14.1 Gemini Simula tor Procedures Cooper The procedures that we went…
255
12.0 PREMISSION PLANNING
12 . 1 Mi ssion Plan (trajectory )
Cooper On these l onger flights you have to be prepared for
more real - time mission pl anning, which we were .
And we had planned on this perhaps being the case
and we hel d al l the flexibility that we could in
our pl anning. You need to get all of the key things
that you ' re going to do planned and trained for as
well as possible, but the way you fit them together
has to be flexible . This applies more to the flight
pl an than it does to the over- all mission plan.
12 . 2 Flight Plan
Cooper Flight plan almost invariably winds up being
l argely real-time planning.
12.3 Spacecraft Changes
Cooper Spacecraft changes has al ways been a sore point with
me and stil l is . I can ' t emphasize enough to give
the crew and everybody el se a fair shake by hol ding
spacecraft changes to a real firm, hard freeze date.
No more changes should be made after a certain date
because it adds hardship to everybody invol ved, and
does not allow the crew time to train. Some changes
are going to be necessary because of what you find
out on the preceding flight, but I think they should
Jl

Not linked to a story yet.

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is under it. 325 pages are in the text index: search them above, or from the library's search.