Documents / Official release

Gemini 5 Technical Debriefing, Part II, 1965

National Aeronautics and Space Administration · 1965 · 325 pages · text from the file's own layer

This is a preliminary Part II transcript of the Gemini 5 (GT-5) flight crew debriefing, prepared by the Spacecraft Operations Branch of NASA's Flight Crew Support Division and dated September 2, 1965. It records astronauts Cooper and Conrad at the Crew Quarters, Cape Kennedy. They discuss how the spacecraft systems worked, including the platform and the OAMS thruster failures. The transcript also covers operational checks, visual sightings, experiments, training, premission planning, and medical aspects. It was originally classified Confidential.

From the source:Release of 2026-06-12 Incident: August 30 - September 2, 1965, Cape Kennedy, Florida. This document is a preliminary transcript (Part II) derived from voice recordings of the Gemini 5 flight crew technical debriefing. NASA conducted this debriefing between August 30, 1965, and September 2, 1965, at the Crew Quarters, Cape Kennedy, Florida. Astronauts L. Gordon Cooper and Charles “Pete” Conrad described observing debris and “snow” and “all sorts of glittering pieces of this, that and the other thing” in the “Visual Sightings” section of the document (pages 157-220).

  • p. 160 …I saw individual houses up in Tibet. One thing I didn't see for Gordo was…
  • p. 242 …shots down of Saigon, Tibet , Tibet , China, Japan , Arabian desert , Tibet , Tibet, China, Arabia, Hanoy, Phillipine…
  • p. 243 232 storm Doreen, West Coast , South Americ a , Andes , Formosa, big Islands of Japan , Tibet mountains…
  • p. 244 …Greed on Tibet? No , that was Gordo -- he real ly goes for that Ti beten country…
244
for regular exercise through the day--both of us used
it. There was no noticeable changes in physiological
condition. I think if anything, it i~ easier to use
inflight than it is on the ground, und.er lg I mean.
One thing I might recommend is that ii have some little
better method of rolling up in maybe some kind of
velcro strap fastened onto it to be able to roll the
thing up into a stowage type configuration. This is
one thing when you start to stow it anywhere , it tends
to keep unrolling and getting all over the place. But
i t worked very well--no problem.
11 . 8 Inflight Phonocardiogram (M-4)
Cooper As far as I know, it functioned all right. It was
just like any other sensor, it itched and was trouble
some as far as another sensor~ It was not comfort
able, but i t was not overly painful, but it certainly
was very noticeable just like other sensors.
11 . 9 Cardiovascular Ref lex Conditioning (M-1)
Cooper This worked for some 4 days on Pete. :3:e was the
one that had this on. There were no procedures
or operational problems--it was turned on and left
on for all this period of time in whic:1. time it
ran out of air and quit and the cuffs ·~ere itching
him very much under his suit, and we p:,:-oceeded to get
his suit •
tEEot.◄ EIDEf',Tl;iill

Not linked to a story yet.

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is under it. 325 pages are in the text index: search them above, or from the library's search.