Documents / Official release

Gemini 5 Technical Debriefing, Part II, 1965

National Aeronautics and Space Administration · 1965 · 325 pages · text from the file's own layer

This is a preliminary Part II transcript of the Gemini 5 (GT-5) flight crew debriefing, prepared by the Spacecraft Operations Branch of NASA's Flight Crew Support Division and dated September 2, 1965. It records astronauts Cooper and Conrad at the Crew Quarters, Cape Kennedy. They discuss how the spacecraft systems worked, including the platform and the OAMS thruster failures. The transcript also covers operational checks, visual sightings, experiments, training, premission planning, and medical aspects. It was originally classified Confidential.

From the source:Release of 2026-06-12 Incident: August 30 - September 2, 1965, Cape Kennedy, Florida. This document is a preliminary transcript (Part II) derived from voice recordings of the Gemini 5 flight crew technical debriefing. NASA conducted this debriefing between August 30, 1965, and September 2, 1965, at the Crew Quarters, Cape Kennedy, Florida. Astronauts L. Gordon Cooper and Charles “Pete” Conrad described observing debris and “snow” and “all sorts of glittering pieces of this, that and the other thing” in the “Visual Sightings” section of the document (pages 157-220).

  • p. 3 …September 2, 1965 at the Crew Quarters, Cape Kennedy, Florida . Although all the material contained in…
  • p. 244 …48 -- wonder what that was -- East Africa, very hazy, African geology, Cape Kennedy , ice particles , and…
21 6
this sloppiness . If these experiments are worth
taking platform time and power to do .
Conrad We've got to say here that there was so much diffi
culty in finding these things and getting organized
that we made onboard decisions to drop this track
ing technique and we used only one method . We both
looked for the target and when we found it, if we
found it, I got Gordo pointed in the right direction
and he put the reticle on it. From then on , he did
the tracking and I took the pictures . I 'd coach
him if he was off at all by looking in the lens .
We never t ried the technique of me flyi::ig and taking
the pictures at the same time . We didn't because
the majority of pictures that they asked for in D- 6
were Questar pictures. I would never have been
able to find it if we were off the leas·~ little bit
because the pictures that they wanted f :l.lled the
whole Questar l ens . We found that the lioresi ght
was perfect so rather than mess things up and we
- - Things were getting worst . To make 11ure that we
got the pictures , we dropped thes e different track
ing modes and we used the same t echniquEi everytime .
Gordo tracked it in the r eticle and I coached him
if he wasn't right on fo~ he picture. I told him
c_Qb4f10Et'4TI L

Not linked to a story yet.

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is above. 325 pages are in the text index: search them above, or from the library's search.