Documents / Official release
This is a preliminary Part II transcript of the Gemini 5 (GT-5) flight crew debriefing, prepared by the Spacecraft Operations Branch of NASA's Flight Crew Support Division and dated September 2, 1965. It records astronauts Cooper and Conrad at the Crew Quarters, Cape Kennedy. They discuss how the spacecraft systems worked, including the platform and the OAMS thruster failures. The transcript also covers operational checks, visual sightings, experiments, training, premission planning, and medical aspects. It was originally classified Confidential.
From the source:Release of 2026-06-12 Incident: August 30 - September 2, 1965, Cape Kennedy, Florida. This document is a preliminary transcript (Part II) derived from voice recordings of the Gemini 5 flight crew technical debriefing. NASA conducted this debriefing between August 30, 1965, and September 2, 1965, at the Crew Quarters, Cape Kennedy, Florida. Astronauts L. Gordon Cooper and Charles “Pete” Conrad described observing debris and “snow” and “all sorts of glittering pieces of this, that and the other thing” in the “Visual Sightings” section of the document (pages 157-220).
“King”2 pages
175 fired, I had the feeling that we pitched up another 30 degrees and went streaming up that way you know, and then another one would f ire , and I really thought we were going around a big circle . That was my physical sensations although the gages said we were right on the money . But, all through retrofire those darn re tros did not overlap . Cooper That 's right . They didn ' t . Number 1 . Conrad Especially 3 and 4. As a ma tter a fact, there was enough of a delay-- "
Not linked to a story yet.
Official release, from the pursue collection. The PDF is mirrored here; the original link is above. 325 pages are in the text index: search them above, or from the library's search.