Documents / Official release

Gemini 5 Technical Debriefing, Part I, 1965

National Aeronautics and Space Administration · 1965 · 223 pages · text from the file's own layer

This is a preliminary transcript of the Gemini V (GT-5) flight crew debriefing, prepared by NASA's Spacecraft Operations Branch, Flight Crew Support Division, and dated September 1, 1965. It records Cooper and Conrad's operational account from the debriefing held August 30 to September 1, 1965 at Cape Kennedy. Topics include countdown, window fogging, POGO vibration, fairing jettison debris, radio loss, reentry and recovery. Visual sightings are left for a later part of the debriefing.

From the source:Release of 2026-06-12 Incident: August 2 - September 2, 1965, Cape Kennedy, Florida. This document is a preliminary transcript (Part I) derived from voice recordings of the Gemini 5 flight crew technical debriefing. NASA conducted this debriefing between August 30, 1965, and September 2, 1965, at the Crew Quarters, Cape Kennedy, Florida.

216
Conrad
Cooper
Conrad
Cooper
RCSD REP
Oh, you mean jettison? Gordo jettisoned about 1
second after we touched down.
About 1 second: after we landed I hit Hand away
it went.
It sat right there beside us and float ed around for
quite a while .
It sat there about 30 yards off to the• f ront and
slightly to one side of us.
Okay.

Not linked to a story yet.

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is under it. 223 pages are in the text index: search them above, or from the library's search.