Documents / Official release

Gemini 5 Technical Debriefing, Part I, 1965

National Aeronautics and Space Administration · 1965 · 223 pages · text from the file's own layer

This is a preliminary transcript of the Gemini V (GT-5) flight crew debriefing, prepared by NASA's Spacecraft Operations Branch, Flight Crew Support Division, and dated September 1, 1965. It records Cooper and Conrad's operational account from the debriefing held August 30 to September 1, 1965 at Cape Kennedy. Topics include countdown, window fogging, POGO vibration, fairing jettison debris, radio loss, reentry and recovery. Visual sightings are left for a later part of the debriefing.

From the source:Release of 2026-06-12 Incident: August 2 - September 2, 1965, Cape Kennedy, Florida. This document is a preliminary transcript (Part I) derived from voice recordings of the Gemini 5 flight crew technical debriefing. NASA conducted this debriefing between August 30, 1965, and September 2, 1965, at the Crew Quarters, Cape Kennedy, Florida.

  • p. 22 …5 or 6 gray splots, just small ones , very small little gray- type splots and I…
  • p. 105 …We al so found that little-hook up was i •eeling gray paint off of those…
  • p. 131 …there were about foUT or five little gray flecks of etuff and debris just flew everywhere…
  • p. 182 …I Looking 180 from the sun you re looking into a gray , black, fuzzy -- boy, there…
191
FCSD Rep
Cooper
FCSD Rep
Cooper
FCSD Rep
Conrad
day the cross-range needle was indicating properly.
The down-range needle , when it came on, stayed in
the same place all the time--all the way through?
Yes.
Full- scale.
Full- scale . Right. Just about full-scale on the
low range .
Okay. How about any of the up- dating done during
reentry?
We got all the times . We got all the times just
fine and I wrote them all down . They gave us
enter blackout at 16: 14, out of blackout at 21:20,
reverse bank at 19:25, bank left 54, and bank right
68 . The drogue time was 22+05, and the main time
was 23+48 , They were all good times. I had them
all written down. No problem. They got the up
dates in before blackout and in plenty of time be
fore blackout, as a matter of fact . We whistled
right in there. No sweat on the times . I guess
maybe we went to the 90 degree bank or something
like that , but from about the time of lg to the time
of guidance locking out, which is roughly 100K and
t he altimeter coming· off the peg, man, I don't
knov whether it was just because we did it for real

Not linked to a story yet.

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is under it. 223 pages are in the text index: search them above, or from the library's search.