Documents / Official release

Gemini 5 Technical Debriefing, Part I, 1965

National Aeronautics and Space Administration · 1965 · 223 pages · text from the file's own layer

This is a preliminary transcript of the Gemini V (GT-5) flight crew debriefing, prepared by NASA's Spacecraft Operations Branch, Flight Crew Support Division, and dated September 1, 1965. It records Cooper and Conrad's operational account from the debriefing held August 30 to September 1, 1965 at Cape Kennedy. Topics include countdown, window fogging, POGO vibration, fairing jettison debris, radio loss, reentry and recovery. Visual sightings are left for a later part of the debriefing.

From the source:Release of 2026-06-12 Incident: August 2 - September 2, 1965, Cape Kennedy, Florida. This document is a preliminary transcript (Part I) derived from voice recordings of the Gemini 5 flight crew technical debriefing. NASA conducted this debriefing between August 30, 1965, and September 2, 1965, at the Crew Quarters, Cape Kennedy, Florida.

  • p. 142 …Cooper We wer e coming right over the Tibet- - the hi gh Tibet QWflO
143
,,.
Cooper
Conrad
Cooper
Conrad
Cooper
Conrad
Cooper
::.
And the computer was in reentry and I said, "Golly,"
and I swi tched that thing to pr elaunch and he said
the loads in and validated , and I didn't get a DCS
light . And I ' d gotten a DCS light everytime .
We never f ailed to get a DCS light .
And I was never reall y convinced even when we
checked the two cores that the l oad wa s r ight that
he put up there , but I guess it was . Tha t ' s been
checked out . We did have the right load in the
computer.
That procedure is r eal ly poor , very , ver y poor .
I don ' t understand . ...
We had agreed and agreed and agreed that nobody
would send a DCS load or anything without permission
f r om you first--t i ll they cleared with you first .
And he just right out of the clear blue sky with
12 minutes-- something like that to go to retro .
27 .
27 was it? Well , anyway , it ' s getting down darn
close . Here we were all l i ned--all set up to go
and everything all squared away and what we thought
was a real proper load out of the Cape . Had gone
into reentry and here we wer e all set . Then here
-CQNElQ f=.W+tAL

Not linked to a story yet.

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is above. 223 pages are in the text index: search them above, or from the library's search.