Documents / Official release

Gemini 5 Technical Debriefing, Part I, 1965

National Aeronautics and Space Administration · 1965 · 223 pages · text from the file's own layer

This is a preliminary transcript of the Gemini V (GT-5) flight crew debriefing, prepared by NASA's Spacecraft Operations Branch, Flight Crew Support Division, and dated September 1, 1965. It records Cooper and Conrad's operational account from the debriefing held August 30 to September 1, 1965 at Cape Kennedy. Topics include countdown, window fogging, POGO vibration, fairing jettison debris, radio loss, reentry and recovery. Visual sightings are left for a later part of the debriefing.

From the source:Release of 2026-06-12 Incident: August 2 - September 2, 1965, Cape Kennedy, Florida. This document is a preliminary transcript (Part I) derived from voice recordings of the Gemini 5 flight crew technical debriefing. NASA conducted this debriefing between August 30, 1965, and September 2, 1965, at the Crew Quarters, Cape Kennedy, Florida.

  • p. 22 …5 or 6 gray splots, just small ones , very small little gray- type splots and I…
  • p. 105 …We al so found that little-hook up was i •eeling gray paint off of those…
  • p. 131 …there were about foUT or five little gray flecks of etuff and debris just flew everywhere…
  • p. 182 …I Looking 180 from the sun you re looking into a gray , black, fuzzy -- boy, there…
133
Cooper
Conrad
IDE1'1TIA -
was when the PC02 started to read for
some reason.
PC02 came off the scale and was reading
way up there for a while. We broke out
one of the co2 tapes, and it showed that
we were still all right . We figured the
gage was its usual reliability.
Okay, now, I think this is good for the
recorder right here. At that time, as
of 5 days 21 hours 00 minutes they
wanted to know what our experiment status
was. So on the UHF , we had completed
tests 1, 2, 3 and I said 6 just so that
if they were still trying to keep that
number under their lid. That's what it
sounded like because they kept mentioning
it. We ' d done D- 1 , 1, ~, and 3 which
had completed D- 1. D- 2 we had done
nothing, because we didn ' t get the REP.
D-6 we'd taken 72 pictures . D- 4 , D- 7 we ' d
had completed 405, 408, 409, 410, 410a,
410b , 411, 414 , 420 , 422 , 423a, 423b , 424a ,
425a. We had 16 minutes and 8 seconds of
Jeo~~f6i~tWon. ~

Not linked to a story yet.

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is above. 223 pages are in the text index: search them above, or from the library's search.