Documents / Official release
This is a preliminary transcript of the Gemini V (GT-5) flight crew debriefing, prepared by NASA's Spacecraft Operations Branch, Flight Crew Support Division, and dated September 1, 1965. It records Cooper and Conrad's operational account from the debriefing held August 30 to September 1, 1965 at Cape Kennedy. Topics include countdown, window fogging, POGO vibration, fairing jettison debris, radio loss, reentry and recovery. Visual sightings are left for a later part of the debriefing.
From the source:Release of 2026-06-12 Incident: August 2 - September 2, 1965, Cape Kennedy, Florida. This document is a preliminary transcript (Part I) derived from voice recordings of the Gemini 5 flight crew technical debriefing. NASA conducted this debriefing between August 30, 1965, and September 2, 1965, at the Crew Quarters, Cape Kennedy, Florida.
“Gray”4 pages
122 remote from there and it would be Dave Scott and Elliot ,a.nd they would start giving us a little poop about what was going to go on that day see--and heck they'd tell us a little bit acout the latest hydrogen calculations er something (laughter) and that was - we 1 ci. sort of get an idea of what was going on, then the next t~ip around is the first time you pick up Carnavon and then he'd sta.xrt to give you an update and he'd get about half way through what you wern going to do in those state- side passes and we ' d pick up Dave Scott again at Canton and he I d finish it and then we'd come by that fringe pass by the states and that ' s when they changed the watch and we'd say hello to everybody that was going off and coming on and then we'd have all the stuff and the next trip around - that would start the three revs over the states see and then it was just go--you had gear all over the spacecraft - gee we had everything
Not linked to a story yet.
Official release, from the pursue collection. The PDF is mirrored here; the original link is above. 223 pages are in the text index: search them above, or from the library's search.