Documents / Official release

Gemini 5 Technical Debriefing, Part I, 1965

National Aeronautics and Space Administration · 1965 · 223 pages · text from the file's own layer

This is a preliminary transcript of the Gemini V (GT-5) flight crew debriefing, prepared by NASA's Spacecraft Operations Branch, Flight Crew Support Division, and dated September 1, 1965. It records Cooper and Conrad's operational account from the debriefing held August 30 to September 1, 1965 at Cape Kennedy. Topics include countdown, window fogging, POGO vibration, fairing jettison debris, radio loss, reentry and recovery. Visual sightings are left for a later part of the debriefing.

From the source:Release of 2026-06-12 Incident: August 2 - September 2, 1965, Cape Kennedy, Florida. This document is a preliminary transcript (Part I) derived from voice recordings of the Gemini 5 flight crew technical debriefing. NASA conducted this debriefing between August 30, 1965, and September 2, 1965, at the Crew Quarters, Cape Kennedy, Florida.

  • p. 22 …5 or 6 gray splots, just small ones , very small little gray- type splots and I…
  • p. 105 …We al so found that little-hook up was i •eeling gray paint off of those…
  • p. 131 …there were about foUT or five little gray flecks of etuff and debris just flew everywhere…
  • p. 182 …I Looking 180 from the sun you re looking into a gray , black, fuzzy -- boy, there…
112
FCSD r ep .
Conrad
Cooper
Conrad
Cooper
FCSD rep.
Conrad
Cooper
Conrad
Cooper
Then the platform wasn ' t on?
Was not on .
That ' s right- -see you got to he able
to have an accurate means of pointing
of having yaw and--
They said pitch up 83 degreeR, yaw 45
degrees left--out of that window. You
don I t have any idea in the wo:dd. I
mean, we didn't even have rat1:! gyros
powered up. You have no idea in the
world where you a.re pointing, just-
You are wasting your time try:Lng to do
this kind of job without a platform .
What is this a shot of--what "i.s this
target?
Well , for any pointing r equiraments ,
especially ones in the sky--
Where they are going at different angles ,
see.
You have to have a platform.
Then along at day 4, 5 hours and 40
minutes , Buzz ' s eX])eriment was placed
in there on a switch--
f

Not linked to a story yet.

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is under it. 223 pages are in the text index: search them above, or from the library's search.