Documents / Official release
This is a preliminary transcript of the Gemini V (GT-5) flight crew debriefing, prepared by NASA's Spacecraft Operations Branch, Flight Crew Support Division, and dated September 1, 1965. It records Cooper and Conrad's operational account from the debriefing held August 30 to September 1, 1965 at Cape Kennedy. Topics include countdown, window fogging, POGO vibration, fairing jettison debris, radio loss, reentry and recovery. Visual sightings are left for a later part of the debriefing.
From the source:Release of 2026-06-12 Incident: August 2 - September 2, 1965, Cape Kennedy, Florida. This document is a preliminary transcript (Part I) derived from voice recordings of the Gemini 5 flight crew technical debriefing. NASA conducted this debriefing between August 30, 1965, and September 2, 1965, at the Crew Quarters, Cape Kennedy, Florida.
“Gray”4 pages
107 :: Cooper Conrad Cooper Conrad Cooper we didn ' t get Venus . We never found it . That' s right. That ' s right. We never even found Venus on that night side. Platform test 2-- And I got a remark here to find out that on day 6 at 01 hours, 02 minutes and 15 seconds where in the heck were we because there were great fires on the ground? Yeah. OK--so I did write it down--all right- SA- D-13, day 3, 18 :16:14--and I had some comments about that here some place . 16:14 - We scored a 4 and a 1--and the 4 was in the upper--the 1 was in the upper left hand box and the 4 was in the second box in the second row. Right. OK about this period of time- let ' s see we had an S- 7--0h, first before this--then we had run some more tests on our primary scanner and found out that it was completely inoperative and--
Not linked to a story yet.
Official release, from the pursue collection. The PDF is mirrored here; the original link is above. 223 pages are in the text index: search them above, or from the library's search.