Documents / Official release

Gemini 4 Experiment Debriefing, 1967

National Aeronautics and Space Administration · 1965 · 224 pages · text from the file's own layer

This NASA file from 1965 combines Mission Operation Report M-913-65-04 on the Gemini 4 (GT-4) flight with related correspondence. Memoranda from the Associate Administrator for Manned Space Flight describe the planned four-day mission with James McDivitt and Edward White, including a spacewalk, a rendezvous with the booster second stage and thirteen experiments. Later letters and telegrams from NASA's Manned Space Science office concern the astronaut debriefing and requests for GT-4 photography and film for scientific analysis.

From the source:Release of 2026-06-12 Incident: June 3-7, 1965, Low Earth Orbit. Gemini IV was the second crewed mission of the Gemini series. Astronauts James McDivitt and Edward White successfully completed the four-day flight between June 3 and June 7, 1965. The mission included the first American spacewalk. This collection of documents contains a transcription of the astronauts recounting their observations of bright particles outside the spacecraft, dated circa June 25, 1967, on pages 78-81, and page 101.

  • p. 2 …Gemini Flight Number Four (GT-4) Additional Flight Activities Subsequent to the preparation of the GT…
  • p. 3 M-913-65-04 ADDITIONAL GT-4 FLIGHT PLAN ACTIVITIES Three additional special engineering and operational…
  • p. 4 …using a maneuver which will place the Gemini spacecraft on an orbit with a predicted lifetime…
  • p. 8 …Gemini Flight Number Four (GT-4) GT-4, the fourth in a series of twelve planned…
  • p. 9 …M-913-65-04 MISSION OPERATION REPORT GEMINI FLIGHT NUMBER FOUR (GT-4) OFFICE OF MANNED…
  • p. 11 …5/24/65 M-913-65-04 GENERAL Gemini Flight Number Four (GT-4) is the…
  • p. 13 …Gemini MOR 1 s and what follows is additional information concerning modifications made to GLV-4…
  • p. 17 …M-4 IN-FLIGHT PHONOCARDIOGRAM PROTOTYPE PHONOCARDIOGRAM TRANSDUCER AND SIGNAL CONDITIONER FIG . 8 GEMINI EXPERIMENT NO…
  • p. 21 M-913-65-04 ASTRONAUTS The Command Pilot for the GT-4 mission will be James…
  • p. 23 …first apogee of GT-4 will be 161 miles. The Gemini launch sequence is shown in…
  • p. 26 M-913-65-03 TABLE IV GT-4 CONSUMABLE LOADINGS ITEM QUANTITY REMARKS Batteries OAMS Propel…
  • p. 28 …ground support network for GT-4 wi 11 be the Gemini Manned Space Flight Network (MSFN…
  • p. 30 M-913-65-04 BACKGROUND Project Gemini is the stepping stone between the comparatively simple one…
  • p. 134 …25, 1965 THE HowItWenton Gemini's4thDay On thew Gemini 5 spa.ce- 43d Orbit--4:50…
  • p. 135 …24, 1965 THE WASHI lGTON POSTA6 GEMINI-From Page Al Gemini MakesPrecision Maneuvers NASA Photo from…
  • p. 165 …2 FROM MG/Deputy Director , Gemini Program SUBJECT: Technical Analysis of Gemini (GT- 4) Photography ~ The…
  • p. 170 …2 FROM MG/Deputy Director, Gemini Program SUBJECT: Technical Analysis of Gemini (GT-4) Photography The…
  • p. 176 …These prints pertain mainly to the S-5 and s-6 Gemini xperimenta. Jocelyn R. Gill…
M-913-65-04
TABLE Ill
IN-FLIGHT ACTIVITIES
Time Revolution
HRS:MIN No.
0:12 1
1:45 2
4:35 3-4
7:45 5-6
11:15 7-8
13:05 9
17:05 11
19:52 13-14
24:00 16
25:58 17-18
29:25 19
31 :20 20
31 :40 21
33:20 22
43:00 28
44:25 29
46:48 30
47:33 31
52:30 33-34
54:35 35
56:35 36-37
41
70:26 46
76:30 49
77:20 50
90:45 58
95:45 61
96-35 62
97:32
97:46 63
5/24/65
EVENT
Insertion Check I ist
D-9 Experiment
Translation Maneuver
D-6 Experiment
MSC-1,2,3, and 10 Experiments
M-3 Experiment
MSC-2 and 3 Experiments
D-8 Experiment
D-9 Experiment
D-1 Experiment
M-3 Experiment
S-5 Experiment
HF Communication Tests
D-9 Experiment
S-6 Experiment
MSC-2 & # Experiments
D-8 Experiment
D-8 Experiment
S-6 Exoeriment
S-6 Experiment
S-5 Experiment
S-6 Experiment
M-3 Experiment
MSC-1 Experiment
Translation Maneuvers
Translation Maneuvers
Thruster Failure Check
Power Down S/C
S-5 Experiment
S-6 Experiment
M-3 Experiment
D-9 Experiment
MSC-2 & 3 Experiments
S-6 Experiment
D-9 Exoeriment
Translation Maneuvers
M-3 Experiment
Apollo Yaw Orientation
Power Down S/ C
M-3 Experiment
D-9 Exoeriment
Power Down S/ C
M-3 Experiment
Pre Retro Checklist, TR-5 Minutes
Checklist, TR-1 Minute Checklist
Retrofire, Retro Jettison, Post-Retro
Checklist
Reentry, Drogue Chute Deploy, Pilot
Chute Deploy, Main Chute Deploy,
Two-Point Suspension, Touchdown,
Post-Landing Checklist
Page 15
Function
CP p Dav Niaht
X X X
X X X
X X
X X
X X
X X
X X
X X
X
X X
X
X
X X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X
X X
X X
X X
X X
X X X
X
X
X X
X X X
:.<. X
X X
X )(
X X
X
X X X X
X X X
X X
X X )(
X X X
X X
X X X
X X X
X X X

Cases discussed

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is above. 224 pages are in the text index: search them above, or from the library's search.