Documents / Official release

Preliminary Gemini 4 Crew Debriefing, Part II, 1965

National Aeronautics and Space Administration · 1965-06-09 · 290 pages · text from the file's own layer

This is a preliminary transcript of Part II of the Gemini 4 (GT-4) flight crew debriefing, prepared by NASA's Spacecraft Operations Branch, Flight Crew Support Division, and dated June 18, 1965. The debriefing began aboard the recovery ship USS Wasp and ended at the Manned Spacecraft Center. In it, astronauts McDivitt and White discuss how the spacecraft systems performed, including the platform, OAMS, RCS and control modes. They also cover operational checks, visual sightings, experiments, mission planning and training, and give recommendations for future crews.

From the source:Release of 2026-06-12 Incident: 6/9/65, North Atlantic Ocean. This document is a preliminary transcript (Part II) derived from voice recordings of the Gemini 4 flight crew debriefing taken aboard the recovery ship, USS Wasp, on June 9, 1965. Part II of this document contains the “Visual Sightings” section of the debriefing (pages 196-224), where astronauts James McDivitt and Edward White describe their observations while aboard the spacecraft.

33
bad as I had expected it was going to be.
I have one more comment. I'd like to comment on
the inner liner. We decided to go with the inner
liner. in and I felt this was a good decision .
The inside of the suit was comfortable , and I
didn ' t get any pressure points . I think one reason
why neither Jim nor I got any particular pressure
points from the suit was that we had worn these
suits a heck of a lot of time . I had over 50
hours on my flight suit. I don't know how many
hours Jim had on his.

Cases discussed

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is above. 290 pages are in the text index: search them above, or from the library's search.