Documents / Official release

Preliminary Gemini 4 Crew Debriefing, Part I, 1965

National Aeronautics and Space Administration · 1965-06-09 · 340 pages · text from the file's own layer

This is a preliminary transcript of Part I of the Gemini 4 (GT-4) flight crew debriefing. The Spacecraft Operations Branch of NASA's Flight Crew Support Division prepared it on June 16, 1965, from recordings of the debriefing held aboard the USS Wasp on June 9, 1965. In it, astronauts McDivitt and White describe the mission from an operational viewpoint, covering countdown, powered flight, insertion, orbital operations, reentry, landing and recovery. According to the preface, visual sightings were left for a later part.

From the source:Release of 2026-06-12 Incident: 6/9/65, North Atlantic Ocean. This document is a preliminary transcript (Part I) derived from voice recordings of the Gemini 4 flight crew debriefing taken aboard the recovery ship, USS Wasp, on June 9, 1965. Astronaut Ed White recounts seeing “sparkles” during the flight.

  • p. 224 …I got another update that said : "Over Cairo on the 26th Rev I ' d have rny…
  • p. 225 …Well, anyway, Cairo and Alexandria were both clear , but this was the first time we'd…
  • p. 255 …I did the second one on Cairo . This was a good run . I went through some…
256
McDivitt
C.QNFIDENT~AI.
time , I copied it as 15: 55 , and t he sec.;ond
time I copied it as 17:10 . This was prior to
firing anything , so I think they corrected one
time only. I thought the rest of it was very
well h8J1dled. We had the times called up and
verified several times .
As we started our pass across t he States , I
started alining the :EDJ.atform.. We had the best
alined platform although we didn ' t really need
an alined platform since we didn't have a
closed loop guidance system. But we sure had
the best alined platform at retrofire that the
space business will probably ever see . I
alined the platform across the United States ,
and then I went to Orbit Rate . I had about
a 20-minute alinement on it and went to Orbit
Rate . We left it in Orbit Rate . I did this
alinement small-end-forward because I wanted
to see where I was going for a change . We
went into the dark side , and we really got
into our checklist then. We performed the P~e
r etro Checklist well in advance of when it was
supposed to be done . It shows it in the flight

Cases discussed

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is above. 340 pages are in the text index: search them above, or from the library's search.