Documents / Official release

Preliminary Gemini 4 Crew Debriefing, Part I, 1965

National Aeronautics and Space Administration · 1965-06-09 · 340 pages · text from the file's own layer

This is a preliminary transcript of Part I of the Gemini 4 (GT-4) flight crew debriefing. The Spacecraft Operations Branch of NASA's Flight Crew Support Division prepared it on June 16, 1965, from recordings of the debriefing held aboard the USS Wasp on June 9, 1965. In it, astronauts McDivitt and White describe the mission from an operational viewpoint, covering countdown, powered flight, insertion, orbital operations, reentry, landing and recovery. According to the preface, visual sightings were left for a later part.

From the source:Release of 2026-06-12 Incident: 6/9/65, North Atlantic Ocean. This document is a preliminary transcript (Part I) derived from voice recordings of the Gemini 4 flight crew debriefing taken aboard the recovery ship, USS Wasp, on June 9, 1965. Astronaut Ed White recounts seeing “sparkles” during the flight.

  • p. 224 …I got another update that said : "Over Cairo on the 26th Rev I ' d have rny…
  • p. 225 …Well, anyway, Cairo and Alexandria were both clear , but this was the first time we'd…
  • p. 255 …I did the second one on Cairo . This was a good run . I went through some…
White
McDivitt
White
McDivitt
White
McDivitt
White
we eliminated the last two steps in it . We did
the zero bank angle and the pitch up and down.
We did the zero pitch angle and the roll left and
right . We did the bank to one side and the pitch
up and down ,and we did the pitch up and the bank
on both sides . We didn ' t do the pitch down and
the bank on both sides ,and we didn't do the roll
left and the pitch up and down. We were running
late and at that time I didn ' t know how we were
doing on electrical' power and everything, so I
elected not to do t he last two portions of the
check.
We had it pretty well ironed out , anyhow .
Yes .
Surprisingly broad bands , too.
The scanners seemed to be working perfectly . The
attitude thruster check was just as it should have
been . We powered down the platform and turned off
the MSC Experiment No . 1 about two minutes late .
We powered down at 13:27.
Okay , seven minutes late . We never did take any
16 mm pho tos of the plumes .
Before you went to sleep on t his one .
<iONFIDENTIA~

Cases discussed

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is above. 340 pages are in the text index: search them above, or from the library's search.