Documents / Official release
This is Modification P00002 to contract HHM402-08-C-0072 with Bigelow Aerospace Advanced Space Studies, LLC of Las Vegas. The Virginia Contracting Activity at Bolling AFB issued it with an effective date of February 2, 2010. It provides $11,948,810.00 to exercise Option Year 1, which runs from September 22, 2009 to September 21, 2010, and brings total obligated funding to $21,948,810.00. It also notes impacts to deliverables and technical risks from reduced funding, and it lists line items such as monthly status reports, research reports and a Comprehensive Integrated Threat Assessment.
From the source: Release of 2026-09-18 Incident: 2/2/10, Washington, D.C.. Released with redactions. This document is an administrative or programmatic record related to the Advanced Aerospace Weapon System Applications Program (AAWSAP), a Defense Intelligence Agency (DIA)-administered program active from 2008 to 2012. AAWSAP’s official scope of work identified 12 technical research areas relating to potential aerospace threats over a time horizon of more than 40 years. As an administrative record, the file documents how AAWSAP was scoped, organized, tasked, funded, or described at a particular point in time. This February 2010 contract modification provides funding for the exercise of Option Year 1 under contract HHM402-08-C-0072 and removes the availability-of-funds contingency that had been imposed in modification P00001. It also states that the modification identifies impacts to deliverables resulting from reduced Option Year 1 funding and incorporates revised documentation showing how Fiscal Year 2010 funds would be used. The modification converts the previously contingent option-year continuation into a funded contract action while acknowledging that reduced funding would affect the planned scope or timing of deliverables.
Unclassified SCHEDULE Continued ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE S AMOUNT S 1001 (Changed Line Item) Option Year: 22 September 2009 - 21 September 2010 Monthly Status Reports Quantity 12 1.00 LO 1,549,100.00 1,549,100.00 Accounting and Appropriation Data: ACRN: AB 9700100.4400 1102A9 25201 S49205 CCXX 16P101T1 1106 610000 $1,549,100.00 Period of Performance: 09/22/2009 to 09/21/2010 1002 (Changed Line Item) Project Management Plan for Tasks 3.a.1 - 3 .a.12 1.00 LO 4,759,300.00 4,759,300.00 Quantity 12 Accounting and Appropriation Data: ACRN:AB 9700100.4400 1102A9 25201 S49205 CCXX 16P101T1 1106 610000 $4,759,300.00 Period of Performance: 09/22/2009 to 09/21/2010 1003 (Changed Line Item) Research Report for Tasks 3.a.1 . - 3.a.12 1.00 LO 2,870,600.00 2,870,600.00 Quantity 12 Accounting and Appropriation Data: ACRN: AB 9700100.4400 1102A9 25201 S49205 CCXX 16P101T1 1106 610000 $2,870,600.00 Period of Performance: 09/22/2009 to 09/21/2010 1004 (Changed Line Item) Comprehensive Integrated Threat Assessment 1.00 LO 220,200.00 220,200.00 Accounting and Appropriation Data: ACRN: AB 9700100.4400 1102A9 25201 S49205 CCXX 16P101T1 1106 610000 $220,200.00 Period of Performance: 09/22/2009 to 09/21/2010 1005 (Changed Line Item) Travel 1.00 LO 36.700.00 36,700.00 Accounting and Appropriation Data: ACRN:AB 9700100.4400 1102A9 25201 S49205 CCXX 16P101T1 1106 610000 $36,700.00 IPeriod or Performance: 09/22/2009 to 09121/201 O (Changed Line Item) 1006 Other Direct Costs 1.00 LO 2,494,610.00 2,494,610.00 Accounting and Appropriation Data: ACRN: AB 9700100.4400 1102A9 25201 S49205 CCXX 16P101T1 PAGE20F Unclassified
Not linked to a story yet.
Official release, from the pursue collection. The PDF is mirrored here; the original link is above. 5 pages are in the text index: search them above, or from the library's search.