Documents / Official release

AAWSAP Contract Modification P00001, September 2009

U.S. Department of War · 2009-09-02 · 4 pages · text from the file's own layer

This contract modification, P00001, was issued by the Virginia Contracting Activity at Bolling AFB in Washington, D.C. It was dated 2 September 2009 and distributed on 8 September 2009. It amends contract HHM402-08-C-0072 with Bigelow Aerospace Advanced Space Studies of North Las Vegas. The modification extends the period of performance to 30 September 2009, sets option year dates of 1 October 2009 to 30 September 2010, and exercises option year 1 subject to the availability of funds. The option covers monthly status reports, research reports and a comprehensive integrated threat assessment.

From the source: Release of 2026-09-18 Incident: 9/2/09, Washington, D.C.. Released with redactions. This document is an administrative or programmatic record related to the Advanced Aerospace Weapon System Applications Program (AAWSAP), a Defense Intelligence Agency (DIA)-administered program active from 2008 to 2012. AAWSAP’s official scope of work identified 12 technical research areas relating to potential aerospace threats over a time horizon of more than 40 years. As an administrative record, the file documents how AAWSAP was scoped, organized, tasked, funded, or described at a particular point in time. This September 2009 contract modification formally extends the Bigelow Aerospace Advanced Space Studies (BAASS) contract through 30 September 2009, revises the option-year dates to run from 1 October 2009 through 30 September 2010, and exercises the first option year subject to the availability of appropriated funds. The document carries forward the same major deliverable categories as the original contract.

UnclassiRed
SCHEDULE Continued
ITEM NO,
1001
1002
1003
1004
1005
1006
5VPPLIE8/IIERVICES
(Changed Line Item}
Option Year: 22 September 2009 - 29 September 2010
Monthly Status Reports
Quantity 12
Period of Performance: 09/2212009 to 09/2112010
(Changed Line Item}
Project Management Plan for Tasks 3.a.1 - 3.a.12
Quantity 12
Period of Per1ormance: 0912212009 lo 09/21/2010
(Changed Line Item)
Research Report for Tasks 3.a.1. - 3.a.12
Quantity 12
Period of Performance: 09/2212009 to 09/21/2010
(Changed line Item}
Comprehensive Integrated Threat Assessment
Period of Performance: 09/22/2009 to 09/2112010
(Changed Line Item)
Travel
Period of Performance: 09122/2009 to 09/2112010
(Changed Lina Item)
Other Direct Costs
Period of Performance: 09122/2009 to 09/21/2010
QVAl<TITY VNrT UNrT PRICE • AlolOUl(J $
OPT
1.00 LO 3,241 ,200.00 3,241,200.00
OPT
1.00 LO 9,957,600.00 9,957,600.00
OPT
1.00 LO 6,006,000.00 6,006,000.00
OPT
1.00 LO 460,800.00 -460,800.00
OPT
1.00 LO 115,000.00 115,000.00
OPT
1.00 LO 5,219,400.00 5,219,400.00
!
PAGE 2 OF
Uncla"med

Not linked to a story yet.

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is above. 4 pages are in the text index: search them above, or from the library's search.