Documents / Official release
This is Standard Form 1449, the solicitation and award for contract HHM402-08-C-0072, issued September 1, 2008 and awarded September 22, 2008, administered by the Virginia Contracting Activity in Washington, D.C. The contractor is Bigelow Aerospace Advanced Space Studies, LLC of Las Vegas, and the total award is $21,948,810. The firm fixed price contract covers a base year and an option year. Deliverables include monthly status reports, project management plans, research reports for Tasks 3.a.1 to 3.a.12, and a Comprehensive Integrated Threat Assessment.
From the source:Release of 2026-09-18 Incident: 9/22/08, Washington, D.C.. Released with redactions. This document is an administrative or programmatic record related to the Advanced Aerospace Weapon System Applications Program (AAWSAP), a Defense Intelligence Agency (DIA)-administered program active from 2008 to 2012. AAWSAP’s official scope of work identified 12 technical research areas relating to potential aerospace threats over a time horizon of more than 40 years. As an administrative record, the file documents how AAWSAP was scoped, organized, tasked, funded, or described at a particular point in time. This September 2008 solicitation/contract/order document serves as the original contract award instrument for AAWSAP work performed by Bigelow Aerospace Advanced Space Studies, Inc. (BAASS), incorporating the contractor’s proposal by reference and translating the earlier Statement of Objectives (DOW-UAP-D110) into priced contract line items. The file breaks the base year into specific deliverable categories, including monthly status reports, program management plans for the 12 technical areas, research reports, a comprehensive integrated threat assessment, travel, and other direct costs, and corresponding option-year line items for follow-on performance.
Read from the scan by GLM-OCR; expect the odd misread word.
(A) Fails to make redelivery of the corrected or replaced supplies within the time established for their return; or (C) May project warranty sampling results over supplies in the same shipment or other supplies contained in other shipments even though all of such supplies are not present at the point of reinspection; provided, that the supplies remaining are reasonably representative of the quantity on which warranty action is proposed; and (D) Need not use the same lot size as on original inspection or reconstitute the original inspection lots. (ii) Within a reasonable time after notice of any breach of the warranties specified in paragraph (b)(1) of this clause, the Contracting Officer may exercise one or more of the following options: (A) Require an equitable adjustment in the contract price for any group of supplies. (B) Screen the supplies grouped for warranty action under this clause at the Contractor''s expense and return all nonconforming supplies to the Contractor for correction or replacement. (C) Require the Contractor to screen the supplies at locations designated by the Government within the contiguous United States and to correct or replace all nonconforming supplies. (D) Return the supplies grouped for warranty action under this clause to the Contractor (irrespective of the f.o.b. point or the point of acceptance) for screening and correction or replacement. (4) (i) The Contracting Officer may, by contract or otherwise, correct or replace the nonconforming supplies with similar supplies from another source and charge to the Contractor the cost occasioned to the Government thereby if the Contractor-- (B) Fails either to accept return of the nonconforming supplies or fails to make progress after their return to correct or replace them so as to endanger performance of the delivery schedule, and in either of these circumstances does not cure such failure within a period of 10 days (or such longer period as the Contracting Officer may authorize in writing) after receipt of notice from the Contracting Officer specifying such failure. (5) The rights and remedies of the Government provided in this clause are in addition to and do not limit any rights afforded to the Government by any other clause of this contract. ## (End of Clause) (ii) Instead of correction or replacement by the Government, the Contracting Officer may require an equitable adjustment of the contract price. In addition, if the Contractor fails to furnish timely disposition instructions, the Contracting Officer may dispose of the nonconforming supplies for the Contractor' s account in a reasonable manner. The Government is entitled to reimbursement from the Contractor, or from the proceeds of such disposal, for the reasonable expenses of the care and disposition of the nonconforming supplies, as well as for excess costs incurred or to be incurred. ## 1.62 52.246-18 WARRANTY OF SUPPLIES OF A COMPLEX NATURE (MAR 2001) (a) "Definitions." As used in this clause-- "Acceptance" means the act of an authorized representative of the Government by which the Government assumes for itself, or as an agent of another, ownership of existing and identified supplies, or approves specific services rendered, as partial or complete performance of the contract. "Supplies" means the end items furnished by the Contractor and related services required under the contract. The word does not include "data." (b) "Contractor''s obligations." (1) The Contractor warrants that for all supplies furnished under this contract will be free from defects in material and workmanship and will conform with all requirements of this contract; provided, however, that with respect to Government-furnished property, the Contractor''s warranty shall extend only to its proper installation, unless the Contractor performs some modification or other work on the property, in which case the Contractor''s warranty shall extend to the modification or other work. (2) Any supplies or parts thereof corrected or furnished in replacement shall be subject to the conditions of this clause to the same extent as supplies initially delivered. This warranty shall be equal in duration to that set forth in paragraph (b)(1) of this clause and shall run from the date of delivery of the corrected or replaced supplies. (3) The Contractor shall not be obligated to correct or replace supplies if the facilities, tooling, drawings, or other equipment or supplies necessary to accomplish the correction or replacement have been made unavailable to the Contractor by action of the Government. In the
Not linked to a story yet.
Official release, from the pursue collection. The PDF is mirrored here; the original link is above. The text was read from the page images by GLM-OCR; expect the odd misread word. 59 pages are in the text index: search them above, or from the library's search.