Documents / Official release

AAWSAP Solicitation and Original Order, September 2008

U.S. Department of War · 2008-09-22 · 59 pages · text by GLM-OCR

This is Standard Form 1449, the solicitation and award for contract HHM402-08-C-0072, issued September 1, 2008 and awarded September 22, 2008, administered by the Virginia Contracting Activity in Washington, D.C. The contractor is Bigelow Aerospace Advanced Space Studies, LLC of Las Vegas, and the total award is $21,948,810. The firm fixed price contract covers a base year and an option year. Deliverables include monthly status reports, project management plans, research reports for Tasks 3.a.1 to 3.a.12, and a Comprehensive Integrated Threat Assessment.

From the source: Release of 2026-09-18 Incident: 9/22/08, Washington, D.C.. Released with redactions. This document is an administrative or programmatic record related to the Advanced Aerospace Weapon System Applications Program (AAWSAP), a Defense Intelligence Agency (DIA)-administered program active from 2008 to 2012. AAWSAP’s official scope of work identified 12 technical research areas relating to potential aerospace threats over a time horizon of more than 40 years. As an administrative record, the file documents how AAWSAP was scoped, organized, tasked, funded, or described at a particular point in time. This September 2008 solicitation/contract/order document serves as the original contract award instrument for AAWSAP work performed by Bigelow Aerospace Advanced Space Studies, Inc. (BAASS), incorporating the contractor’s proposal by reference and translating the earlier Statement of Objectives (DOW-UAP-D110) into priced contract line items. The file breaks the base year into specific deliverable categories, including monthly status reports, program management plans for the 12 technical areas, research reports, a comprehensive integrated threat assessment, travel, and other direct costs, and corresponding option-year line items for follow-on performance.

Read from the scan by GLM-OCR; expect the odd misread word.

## F.2 52.247-34 F.O.B. DESTINATION (NOV 1991)

(a) The term "f.o.b. destination," as used in this clause, means--

(1) Free of expense to the Government, on board the carrier''s conveyance, at a specified delivery point where the consignee''s facility (plant, warehouse, store, lot, or other location to which shipment can be made) is located; and

(b) The Contractor shall--

(3) Deliver the shipment in good order and condition to the point of delivery specified in the contract;

(2) Supplies shall be delivered to the destination consignee' s wharf (if destination is a port city and supplies are for export), warehouse unloading platform, or receiving dock, at the expense of the Contractor. The Government shall not be liable for any delivery, storage, demurrage, accessorial, or other charges involved before the actual delivery (or "constructive placement" as defined in carrier tariffs) of the supplies to the destination, unless such charges are caused by an act or order of the Government acting in its contractual capacity. If rail carrier is used, supplies shall be delivered to the specified unloading platform of the consignee. If motor carrier (including "piggyback") is used, supplies shall be delivered to truck tailgate at the unloading platform of the consignee, except when the supplies delivered meet the requirements of Item 568 of the National Motor Freight Classification for "heavy or bulky freight." When supplies meeting the requirements of the referenced Item 568 are delivered, unloading (including movement to the tailgate) shall be performed by the consignee, with assistance from the truck driver, if requested. If the contractor uses rail carrier or freight forwarded for less than carload shipments, the contractor shall ensure that the carrier will furnish tailgate delivery, when required, if transfer to truck is required to complete delivery to consignee.

(1)

(i) Pack and mark the shipment to comply with contract specifications; or

(ii) In the absence of specifications, prepare the shipment in conformance with carrier requirements;

(2) Prepare and distribute commercial bills of lading;

(4) Be responsible for any loss of and/or damage to the goods occurring before receipt of the shipment by the consignee at the delivery point specified in the contract;

(5) Furnish a delivery schedule and designate the mode of delivering carrier; and

(6) Pay and bear all charges to the specified point of delivery.

(End of Clause)

Not linked to a story yet.

About this file

Official release, from the pursue collection. The PDF is mirrored here; the original link is above. The text was read from the page images by GLM-OCR; expect the odd misread word. 59 pages are in the text index: search them above, or from the library's search.