This final report, dated September 10, 1996, was prepared by the Research Triangle Institute for the Department of the Air Force's 45th and 30th Space Wing safety offices. Titled Modeling Unlikely Space-Booster Failures in Risk Calculations, it shows how rare Mode-5 failures, in which a rocket veers well off its intended flight line, are modeled in the DAMP risk-analysis program. An appendix lists Atlas, Delta, Titan and Thor launch and failure histories through August 1996.

From the source:Release of 2026-05-08 Incident: 9/10/96, N/A. This report describes the Modeling of Unlikely Space-Booster Failures in Risk Calculations, documenting historical launch failure modes and recommending corrective actions to address them using novel modelling techniques.

  • p. 88 …Vehicle loses control at or shortly after liftoff, with all flight directions equally likely. Destruct is…
  • p. 106 …121 (8) Missiles/Space Vehicle Files, 45th Space Wing, Wing Safety, Mission Flight Control and Analysis…
  • p. 111 …Such behavior did not necessarily prevent the attainment of some, or even all, mission objectives. 50…
  • p. 131 …Due to excess speed, spacecraft passed 22,000 miles in front of moon, and primary mission…
  • p. 132 …Although Atlas performance was satisfactory, the mission was apparently a failure. No other data available. 134…
  • p. 133 …A flight-control malfunction occurred at about 15 seconds at the start of the pitch program…
  • p. 137 …Vehicle became unstable when B2 pitch control was lost at 121 seconds. Loss of pitch control…
  • p. 138 …The missile then lost attitude control, executing a hard yaw rate tum throughout and beyond the…
  • p. 139 …of the rate gyro or an electrical failure in the pitch channel of the flight control…
  • p. 140 caused yaw and roll rates that the flight control system could not correct. As a result…
  • p. 151 …Attitude control lost during second stage coast period. Third stage spun up, but did not fire…
  • p. 153 …One solid-rocket motor carried to MECO, but mission was still a complete success. 102. SMS…
  • p. 169 …Missile tumbled out of control at 130 seconds, then broke up. 104. IHA (65-210), 1…
  • p. 170 …Nominal mission through transtage second burn shutdown. Attitude control system engine failed to shutdown following vernier…
  • p. 171 …However, satellite propulsion system malfunctioned putting satellite in uncontrollable position with no possibility of restoring mission…
  • p. 172 …control until propellant depletion. Trajectory inaccuracies were compensated for during Stage-2 burn, and the mission…
  • p. 180 …Missiles/Space Vehicle Files, 45th Space Wing, Wing Safety, Mission Flight Control and Analysis (SEO), 1957…
6.3.2 Launch-Area Mode-5 Risks
Using values of A and B from Figure 24 and Figure 25, program DAMP was run to
compute Mode-5 launch-area risks for population centers inside the impact limit lines
for a Delta-GEM/GPS-10 daytime launch from Pad 17A. Results from these and two
other cases are shown in Table 23. The Mode-5 Ee in the first line (old baseline case) is
presented for comparison. It was obtained from the first line of Table 55 of an- earlier
RTI study31• In that study, the total Delta failure probability during the first 130
seconds of flight was set at 0.02, with the probability of a Mode-5 response assumed to
be 0.0025. The second line in Table 23 shows the result of a recomputation of the Mode-
s risks, again with B =1,000 and A =3, using failure probabilities derived earlier in this
report. From Table 6 and Table 15, the failure probability during flight phases O- 2 is
0.013, and the relative frequency of occurrence of a Mode-5 response is 0.08. The
absolute probability of a Mode-5 response thus becomes 0.013 x 0.08 =0.001.
Table 23. Shaping Constants and Related Risks for Delta-GEM
TB Breakupqa Mode-5 Ee
Ps (sec) (deg-lb/ft2) B A (x 104,)
0.0025 130 12,000 * 1,000 3.00 394
(baseline)
0.001 270 12,000 * 1,000 3.00 88.8
(newp,&T,.)
0.001 270 none 1,000 1.90 220.0
20,000 2.90 104.4
10,000 3.10 74.1
5,000 4.30 5.2
0.001 270 none 10,000 2.60 224.4
20,000 2,000 3.15 102.4
10,000 2,000 3.35 72.0
5,000 4 3.50 5.1
* Interpolated from data contained in Figure 24
As in the case of Atlas, Table 23 again shows that the risks in the launch area are highly
dependent on qa and thus on A, but relatively insensitive to changes in B if a proper
value is selected for A. For example, if qa. =10,000, the computed risks for B =1,000
(A= 3.10) and B = 2,000 (A= 3.35) differ by-less than 3%. For the no-breakup cases
where B = 1,000 and then 10,000, the computed risks in the launch area differ by less
than2%.
Launch-area risks are highly dependent on the vehicle's capability to withstand
aerodynamic forces. Except early in flight, low-strength vehicles generally break up
quickly after a malfunction turn begins. The later such turns occur, the more likely
pieces are to impact downrange of the launch point, thus lessening risks to uprange
populations. The effects of vehicle strength on risk are clearly seen in Table 23 where,
9/10/96 64 RT!