This final report, dated September 10, 1996, was prepared by the Research Triangle Institute for the Department of the Air Force's 45th and 30th Space Wing safety offices. Titled Modeling Unlikely Space-Booster Failures in Risk Calculations, it shows how rare Mode-5 failures, in which a rocket veers well off its intended flight line, are modeled in the DAMP risk-analysis program. An appendix lists Atlas, Delta, Titan and Thor launch and failure histories through August 1996.

From the source:Release of 2026-05-08 Incident: 9/10/96, N/A. This report describes the Modeling of Unlikely Space-Booster Failures in Risk Calculations, documenting historical launch failure modes and recommending corrective actions to address them using novel modelling techniques.

  • p. 88 …Vehicle loses control at or shortly after liftoff, with all flight directions equally likely. Destruct is…
  • p. 106 …121 (8) Missiles/Space Vehicle Files, 45th Space Wing, Wing Safety, Mission Flight Control and Analysis…
  • p. 111 …Such behavior did not necessarily prevent the attainment of some, or even all, mission objectives. 50…
  • p. 131 …Due to excess speed, spacecraft passed 22,000 miles in front of moon, and primary mission…
  • p. 132 …Although Atlas performance was satisfactory, the mission was apparently a failure. No other data available. 134…
  • p. 133 …A flight-control malfunction occurred at about 15 seconds at the start of the pitch program…
  • p. 137 …Vehicle became unstable when B2 pitch control was lost at 121 seconds. Loss of pitch control…
  • p. 138 …The missile then lost attitude control, executing a hard yaw rate tum throughout and beyond the…
  • p. 139 …of the rate gyro or an electrical failure in the pitch channel of the flight control…
  • p. 140 caused yaw and roll rates that the flight control system could not correct. As a result…
  • p. 151 …Attitude control lost during second stage coast period. Third stage spun up, but did not fire…
  • p. 153 …One solid-rocket motor carried to MECO, but mission was still a complete success. 102. SMS…
  • p. 169 …Missile tumbled out of control at 130 seconds, then broke up. 104. IHA (65-210), 1…
  • p. 170 …Nominal mission through transtage second burn shutdown. Attitude control system engine failed to shutdown following vernier…
  • p. 171 …However, satellite propulsion system malfunctioned putting satellite in uncontrollable position with no possibility of restoring mission…
  • p. 172 …control until propellant depletion. Trajectory inaccuracies were compensated for during Stage-2 burn, and the mission…
  • p. 180 …Missiles/Space Vehicle Files, 45th Space Wing, Wing Safety, Mission Flight Control and Analysis (SEO), 1957…
c. Insertion of improper computer programs
d. Support-personnel fatigue
A third limitation of the parts-analysis approach discussed in Ref. [4] deals with the
subjectivity and invalid assumptions often used to· estimate piece/component reliabilities.
Here Booz•Allen quotes from a reporf1 by the Office of Technology Assessment, and we
do likewise:
"The design reliability of proposed vehicles is generally estimated using:
Data from laboratory tests of vehicle systems (e.g., engines and avionics) and
components that have already been built;
Engineer's judgments about the reliability- achievable in systems and
components that have not been built;
Analyses of whether a failure in one system or component would cause other
systems and components, or the vehicle to fail; and
Assumptions (often tacit) that:
the laboratory conditions under which systems were tested precisely
duplicate the conditions under which the systems will operate,
the conditions under which the system will operate are those under which
theywere designed to operate,
the engineer's judgments about reliability are correct, and
the failure analyses considered all circumstances and details that influence
reliability:
Such engineering estimates of design·reliability are incomplete and subjective...".
Effects influencing reliability that the analyst may fail to consider include:
a. Lightning strikes
b. Aging effects, particularly for solid propellants
c. Corrosion
d. Insufficient heat or cold insulation for critical components
e.Idng
f. Erroneous antennae patterns or instrumentation
Booz• Allen concludes as follows:·
''Finally, due to its nature, the engineering approach can not account for
undetected design flaws. (If these flaws were detected, and could be modeled,
9/10/96 14 RTI

Not linked to a story yet.

About this file

Report, from the pursue collection. The PDF is mirrored here; the original link is under it. 181 pages are in the text index: search them above, or from the library's search.