Department of the Air Force Report, 1996

U.S. Department of War · 1996-09-10 · 181 pages · text from the file's own layer

This final report, dated September 10, 1996, was prepared by the Research Triangle Institute for the Department of the Air Force's 45th and 30th Space Wing safety offices. Titled Modeling Unlikely Space-Booster Failures in Risk Calculations, it shows how rare Mode-5 failures, in which a rocket veers well off its intended flight line, are modeled in the DAMP risk-analysis program. An appendix lists Atlas, Delta, Titan and Thor launch and failure histories through August 1996.

From the source:Release of 2026-05-08 Incident: 9/10/96, N/A. This report describes the Modeling of Unlikely Space-Booster Failures in Risk Calculations, documenting historical launch failure modes and recommending corrective actions to address them using novel modelling techniques.

  • p. 5 …64 6.4 Shaping Constants for Titan IV................................................................................ 65 6.5 Shaping Constants for LLVl .................................................................................... 69…
  • p. 74 …6.4 Shaping Constants for Titan IV Mode-5 shaping constants for Titan IV were developed…
  • p. 77 …Shaping Constants for Titan IV TB (sec) Breakupqa (deg-lb/ft2) B A II 300 none…
  • p. 109 …Titan IIIC and later configurations to include IIIB, IIID, IIIE, 34B, 34D, III/CT, IV, II…
  • p. 155 …Titan II SLV was developed from refurbished Titan II ICBMs incorporating technology and hardware from the…
  • p. 156 …Summa of Titan Vehicle Confi rations Descri Titan II ICBM converted to a man-rated vehicle…
  • p. 159 …2 0 54 WS (first Titan II) 03/16/62 II (N-2) ER 0 55…
  • p. 160 …08/13/64 II (8-7) WR 0 104 SV (first Titan Ill) 09/01/64…
  • p. 166 D.4.2 Titan Failure Narratives The following narratives provide available details about each Titan failure…
  • p. 168 …Stage II engine shut down prematurely due to oxidizer bootstrap-line failure. 76. Titan I (Mares…
  • p. 169 …Titan II (Thread Needle), 20 June 63, Response Mode 5, Flight Phase 2: Flight appeared normal…
  • p. 170 …Titan II (Bold Guy), 21 Sep 65, Response Mode 4, Flight Phase 2: After a normal…
  • p. 172 …Following a successful Titan-II second-stage burn and after payload separation, the apogee- kick motor…
S/ A-1 shut down at 213 sec due to failure of its turbopump assembly. The vehicle
continued flight till 221 seconds when erratic attitude rates were noted. At 229
seconds, the impact point stopped. At 257 seconds, the pressure dropped to zero
in the stage-1 thrust-chamber assembly 2. At the same time, stages 1 and 2
separated as stage 2 ignited. After this time, stage-2 attitude rates were erratic.
Destruct was sent by the RSO at 273 seconds.
307. 34D (AFSC), 18 Apr 86, Response Mode 4, Flight Phase 0: At about 8.8 seconds
after liftoff, the insulation and case of SRM No. 2 debonded resulting in case
rupture immediately thereafter. The core vehicle was destroyed by fragments
from the ruptured motor. Auto-destruct was activated on SRM-1 at 9.0 seconds.
311. 34D-3/Transtage, 2 Sep 88, Response Mode NA, Flight Phase 5: Transtage
pressurization system failed due to damage to the upper portion of the transtage
fuel tank and pressurization lines. A_ leak of 1,340 pounds occurred during park
orbit, and a large helium-tank gas leak occurred during transtage first burn. Not
enough helium was left in system to allow start of second bum. The payload was
left in a geostationary transfer orbit.
315. Titan IV-1/IUS, 14 June 89, Response Mode NA, Flight Phase 1: Late in Stage-1
burn, one of the engines failed and shut down. The other engine was able to
gimbal sufficiently to maintain control until propellant depletion. Trajectory
inaccuracies were compensated for during Stage-2 burn, and the mission was a
success.
319. Commercial Titan, 14 Mar 90, Response Mode NA, Flight Phase 2.5 and 5: Boost
phase was satisfactory. The payload separation system was designed for two
satellites and had two discrete outputs from the missile guidance computer
(MGC), but for this mission it carried only a single satellite. The wiring team
miswired the harness, which connected the MGC payload-separation discretes to
the payload separation device, so the satellite never received the separation signal.
PKM and satellite did not separate from Stage II resulting in low-earth elliptical
orbit. Ground controllers were able to separate satellite hours later but PKM
remained attached to Stage II.
328. IV, 2 Aug 93, Response Mode 4, Flight Phase 0: A leak occurred in SRM#l at 99.9
seconds that rapidly enveloped the vehicle in propellant gases. Approximately
1.6 seconds later the vehicle blew up and disintegrated, apparently due to
activation of the inadvertent-separation destruct system. . Destruct was
transmitted at 104.5 seconds.
329. II/SLV (Landsat 6), 5 Oct 93, Response Mode 4, Flight Phase 2: Following a
successful Titan-II second-stage burn and after payload separation, the apogee-
kick motor failed to ignite and circularize the highly-elliptical orbit. The Landsat
payload and Titan II followed a ballistic trajectory back into the atmosphere
where bumup occurred.
9/10/96 163 RTI

Not linked to a story yet.

About this file

Report, from the pursue collection. The PDF is mirrored here; the original link is above. 181 pages are in the text index: search them above, or from the library's search.