U.S. Department of War · 1996-09-10 · 181 pages · text from the file's own layer

This final report, dated September 10, 1996, was prepared by the Research Triangle Institute for the Department of the Air Force's 45th and 30th Space Wing safety offices. Titled Modeling Unlikely Space-Booster Failures in Risk Calculations, it shows how rare Mode-5 failures, in which a rocket veers well off its intended flight line, are modeled in the DAMP risk-analysis program. An appendix lists Atlas, Delta, Titan and Thor launch and failure histories through August 1996.

From the source:Release of 2026-05-08 Incident: 9/10/96, N/A. This report describes the Modeling of Unlikely Space-Booster Failures in Risk Calculations, documenting historical launch failure modes and recommending corrective actions to address them using novel modelling techniques.

  • p. 88 …Vehicle loses control at or shortly after liftoff, with all flight directions equally likely. Destruct is…
  • p. 106 …121 (8) Missiles/Space Vehicle Files, 45th Space Wing, Wing Safety, Mission Flight Control and Analysis…
  • p. 111 …Such behavior did not necessarily prevent the attainment of some, or even all, mission objectives. 50…
  • p. 131 …Due to excess speed, spacecraft passed 22,000 miles in front of moon, and primary mission…
  • p. 132 …Although Atlas performance was satisfactory, the mission was apparently a failure. No other data available. 134…
  • p. 133 …A flight-control malfunction occurred at about 15 seconds at the start of the pitch program…
  • p. 137 …Vehicle became unstable when B2 pitch control was lost at 121 seconds. Loss of pitch control…
  • p. 138 …The missile then lost attitude control, executing a hard yaw rate tum throughout and beyond the…
  • p. 139 …of the rate gyro or an electrical failure in the pitch channel of the flight control…
  • p. 140 caused yaw and roll rates that the flight control system could not correct. As a result…
  • p. 151 …Attitude control lost during second stage coast period. Third stage spun up, but did not fire…
  • p. 153 …One solid-rocket motor carried to MECO, but mission was still a complete success. 102. SMS…
  • p. 169 …Missile tumbled out of control at 130 seconds, then broke up. 104. IHA (65-210), 1…
  • p. 170 …Nominal mission through transtage second burn shutdown. Attitude control system engine failed to shutdown following vernier…
  • p. 171 …However, satellite propulsion system malfunctioned putting satellite in uncontrollable position with no possibility of restoring mission…
  • p. 172 …control until propellant depletion. Trajectory inaccuracies were compensated for during Stage-2 burn, and the mission…
  • p. 180 …Missiles/Space Vehicle Files, 45th Space Wing, Wing Safety, Mission Flight Control and Analysis (SEO), 1957…
Launch Vehicle Test Response Flight Rep.
No. Mission/ID Date Confiauratlon Ranae Mode Phase Conf.
307 AFSC 04/18/86 34D-9 WR 4 0 1
308 AFSC 02/11/87 1118/AGENA D {348-11) WR 1
309 AFSC 10/26/87 340-15 WR 1
310 SV-00D 11/29/87 34D-8/Trans. ER 1
311 SV-D00 09/02/88 34D-3/Trans. ER NA 5 1
312 AFSC 09/05/88 11/SLV (23G-1) WR 1
313 AFSC 11/06/88 340-14 WR 1
314 SV-000 05/10/89 340-16/frans. ER 1
315 SV (first T-IV) 06/14189 IV-1/IUS ER NA 1 1
316 SV-DOD 09/04/89 340-2/Trans. ER 1
317 AFSC 09/05/89 11/SLV (23G-2) WR 1
318 SV-JAPAN/UK 01/01/90 Ill ER 1
319 SV-INTELSAT VI 03/14/90 Ill ER NA 2.5&5 1
320 SV-D00 06/08/90 IV-4 ER 1
321 SV-INTELSAT VI 06/23/90 Ill ER 1
322 SV-000 11/13/90 IV-6/IUS ER 1
323 AFSC 03/08/91 IV WR 1
324 AFSC 11/17/91 IV WR 1
325 AFSC 04/25/92 ll/SLV WR 1
326 SV-MARS OBS. · 09/25/92 Ill ER 1
327 AFMC 11/28/92 IV WR 1
328 AFMC 08/02/93 IV (K-11) WR 4 0 1
329 LANDSAT6 10/05/93 11/SLV WR 4 2 1
330 CLEMENTINE 01/25/94 11/SLV WR 1
331 SV-MILSTAR 02/07/94 TIV-CENTAUR (K·10) ER 1
332 SV-D00 05/03/94 TIV-CENTAUR (K-7) ER 1
333 SV-DOD 08/27/94 TIV-CENTAUR {K-9) ER 1
334 SV-D00 12122194 IV-IUS (K-14) ER 1
335 SV-D00 05/14/95 TIV-CENTAUR (K-23) ER 1
336 SV-D00 07/10/95 TIV-CENTAUR (K-19) ER 1
337 SV-MILSTAR 11/06/95 TIV-CENTAUR (K-21) ER 1
338 DOD 04/24/96 TIV-CENTAUR (K-16) ER 1
339 DOD 07/02/96 TIV-NUS (K2) ER 1
9/10/% 156 RTI