Documents / Report
This final report, dated September 10, 1996, was prepared by the Research Triangle Institute for the Department of the Air Force's 45th and 30th Space Wing safety offices. Titled Modeling Unlikely Space-Booster Failures in Risk Calculations, it shows how rare Mode-5 failures, in which a rocket veers well off its intended flight line, are modeled in the DAMP risk-analysis program. An appendix lists Atlas, Delta, Titan and Thor launch and failure histories through August 1996.
From the source:Release of 2026-05-08 Incident: 9/10/96, N/A. This report describes the Modeling of Unlikely Space-Booster Failures in Risk Calculations, documenting historical launch failure modes and recommending corrective actions to address them using novel modelling techniques.
“Mission Control”17 pages
spacecraft into a lunar orbit. Possible cause was malfunction of the coast-control system after third-stage spinup and separation 59. Intelsat III A, 18 Sep 68, Response Mode 5, Flight Phase 1: Due to loss of rate gyro, undamped pitch oscillations began at 20 seconds. Vehicle began a series of violent maneuvers at 59 seconds. During the 13-second period while these maneuvers continued, the vehicle pitched down some 270°, then up 210°, and then made a large yaw to the left. At 72 seconds the vehicle regained control and flew stably in a down and leftward direction until 100 seconds. At this time, with the main engine against the pitch and yaw stops, the destabilizing aerodynamic forces became so large that quasi-control could no longer be maintained. The first stage broke up at 103 seconds. The second stage was destroyed by the RSO at 110.6 seconds. Major pieces impacted about 12 miles downrange and 2 miles left of the flight line. • 71. Intelsat III E, 26 July 69, Response Mode NA, Flight Phase 3 and 5: Unknown but anomalous third-stage performance inserted payload into an erroneous orbit. Apogee was some 17,000 miles too low and orbital inclination was 1.5° above planned 28.8° 73. Pioneer E, 27.Aug 69, Response Mode 5, Flight Phase 1: First-stage hydraulics system failed a few seconds before burnout (MECO). The vehicle pitched down, yawed left, rolled counterclockwise driving all gyros off limits, and then tumbled. Second-stage separation and ignition occurred while the vehicle was out of control. After about 20 seconds, the second stage regained control in a yaw-right, pitch-up attitude. The vehicle flew stably in this attitude for about 240 seconds until destroyed by the safety officer at T+484 seconds. 78. Intelsat III G, 22 Apr 70, Response Mode NA, Flight Phase 1 and 5: The flight was considered a success, although low first-stage velocity resulted in a propellant- depletion shutdown of the second stage. As a result, the actual apogee was some 2,220 miles below the planned value of 195,400 miles, and well outside three- sigma limits. 85. 0S0-H, 29 Sep 71, Response Mode NA, Flight Phase 2 and 5: Stage-2 hydraulic- system failure caused faulty control during second-stage bum. Spacecraft injected initially into an elliptical orbit, but was later maneuvered into a more satisfactory orbit although perigee was still about 93 miles below the planned value. 86. ITOS-B (WTR), 21 Oct 71, Response Mode 4, Flight Phase 2: Contamination in the oxygen vent valve apparently prevented its proper operation throughout flight. This led to bulkhead rupture during second-stage bum and loss of vehicle control. 9/10/96 143
Not linked to a story yet.
Report, from the pursue collection. The PDF is mirrored here; the original link is above. 181 pages are in the text index: search them above, or from the library's search.