Documents / Report

Department of the Air Force Report, 1996

U.S. Department of War · 1996-09-10 · 181 pages · text from the file's own layer

This final report, dated September 10, 1996, was prepared by the Research Triangle Institute for the Department of the Air Force's 45th and 30th Space Wing safety offices. Titled Modeling Unlikely Space-Booster Failures in Risk Calculations, it shows how rare Mode-5 failures, in which a rocket veers well off its intended flight line, are modeled in the DAMP risk-analysis program. An appendix lists Atlas, Delta, Titan and Thor launch and failure histories through August 1996.

From the source:Release of 2026-05-08 Incident: 9/10/96, N/A. This report describes the Modeling of Unlikely Space-Booster Failures in Risk Calculations, documenting historical launch failure modes and recommending corrective actions to address them using novel modelling techniques.

  • p. 88 …Vehicle loses control at or shortly after liftoff, with all flight directions equally likely. Destruct is…
  • p. 106 …121 (8) Missiles/Space Vehicle Files, 45th Space Wing, Wing Safety, Mission Flight Control and Analysis…
  • p. 111 …Such behavior did not necessarily prevent the attainment of some, or even all, mission objectives. 50…
  • p. 131 …Due to excess speed, spacecraft passed 22,000 miles in front of moon, and primary mission…
  • p. 132 …Although Atlas performance was satisfactory, the mission was apparently a failure. No other data available. 134…
  • p. 133 …A flight-control malfunction occurred at about 15 seconds at the start of the pitch program…
  • p. 137 …Vehicle became unstable when B2 pitch control was lost at 121 seconds. Loss of pitch control…
  • p. 138 …The missile then lost attitude control, executing a hard yaw rate tum throughout and beyond the…
  • p. 139 …of the rate gyro or an electrical failure in the pitch channel of the flight control…
  • p. 140 caused yaw and roll rates that the flight control system could not correct. As a result…
  • p. 151 …Attitude control lost during second stage coast period. Third stage spun up, but did not fire…
  • p. 153 …One solid-rocket motor carried to MECO, but mission was still a complete success. 102. SMS…
  • p. 169 …Missile tumbled out of control at 130 seconds, then broke up. 104. IHA (65-210), 1…
  • p. 170 …Nominal mission through transtage second burn shutdown. Attitude control system engine failed to shutdown following vernier…
  • p. 171 …However, satellite propulsion system malfunctioned putting satellite in uncontrollable position with no possibility of restoring mission…
  • p. 172 …control until propellant depletion. Trajectory inaccuracies were compensated for during Stage-2 burn, and the mission…
  • p. 180 …Missiles/Space Vehicle Files, 45th Space Wing, Wing Safety, Mission Flight Control and Analysis (SEO), 1957…
Launch Vehicle Test Response Flight Rep.
No. Mission/ID Date Confiauration Range Mode Phase Conf.
169 EXOSAT 05/26/83 3914 WR 1
170 GALAXY-A 06/28/83 3920 PAM ER 1
171 TELSTAR-3A 07/28/83 3920 PAM ER 1
172 RCA-G 09/08/83 3924 ER 1
173 GALAXY-B 09/22/83 3920 PAM ER 1
174 L&SAT-D' 03/01/84 3920 WR 1
175 AMPTE 08/16/84 3924 ER 1
176 GALAXY-C 09/21/84 3920 PAM ER 1
177 NATO-IIID 11/14/84 3914 ER 1
178 GOES-G 05/03/86 3914 ER 4 1 1
179 DELTA 180 09/05/86 3920 ER 1
180 GOES-H 02/26/87 3924 ER 1
181 PALAPA B2-P 03/20/87 3920 PAM ER 1
182 DELTA 181 02/08/88 3910 ER 1
183 NAVSTAR 11-1 02/14/89 6925 ER 1
184 DELTA STAR 03/24/89 3920 ER 1
185 NAVSTAR 11-2 06/10/89 6925 ER 1
186 NAVSTAR 11-3 08/18/89 6925 ER 1
187 BSB-R1 08/27/89 4925 ER 1
188 NAVSTAR 11-4 10/21/89 6925 ER 1
189 OOBE 11/18/89 5920 WR 1
190 NAVSTAR 11-5 12/11/89 6925 ER 1
191 NAVSTAR 11-6 01/24/90 6925 ER 1
192 LOSAT 02/14/90 6920-8 ER 1
193 NAVSTAR 11-7 03/26/90 6925 ER 1
194 PALAPA B-2R 04/13/90 6925 ER 1
195 ROSAT 06/01/90 6920-10 ER 1
196 INSAT-1D 06/11/90 4925 ER 1
197 NAVSTAR 11-8 • 08/02/90 6925 ER 1
198 BSB-R2 08/18/90 6925 ER 1
199 NAVSTAR 11-9 10/01/90 6925 ER 1
200 INMARSAT-2F1 10/30/90 6925 ER 1
201 NAVSTAR 11-10 11/26/90 7925 ER 1
202 NATO IVA 01/07/91 7925 ER 1
203 INMARSAT-2F2 03/08/91 6925 ER 1
204 ASC-2 04/12/91 7925 ER 1
205 AURORA II 05/29/91 7925 ER 1
206 NAVSTAR 11-11 07/03/91 7925 ER 1
207 NAVSTAR 11-12 02/23/92 7925 ER 1
208 NAVSTAR 11-13 04/09/92 7925 ER 1
209 PALAPA 84 05/13/92 7925-8 ER 1
210 EUVE 06/07/92 6920-10 ER 1
211 NAVSTAR 11-14 07/07/92 7925 ER 1
212 GEOTAIL 07/24/92 6925 ER 1
213 SATCOM C4 08/31/92 7925 ER 1
214 NAVSTAR 11-15 09/09/92 7925 ER 1
9/10/96 140 RTI

Not linked to a story yet.

About this file

Report, from the pursue collection. The PDF is mirrored here; the original link is above. 181 pages are in the text index: search them above, or from the library's search.