This final report, dated September 10, 1996, was prepared by the Research Triangle Institute for the Department of the Air Force's 45th and 30th Space Wing safety offices. Titled Modeling Unlikely Space-Booster Failures in Risk Calculations, it shows how rare Mode-5 failures, in which a rocket veers well off its intended flight line, are modeled in the DAMP risk-analysis program. An appendix lists Atlas, Delta, Titan and Thor launch and failure histories through August 1996.

From the source:Release of 2026-05-08 Incident: 9/10/96, N/A. This report describes the Modeling of Unlikely Space-Booster Failures in Risk Calculations, documenting historical launch failure modes and recommending corrective actions to address them using novel modelling techniques.

  • p. 88 …Vehicle loses control at or shortly after liftoff, with all flight directions equally likely. Destruct is…
  • p. 106 …121 (8) Missiles/Space Vehicle Files, 45th Space Wing, Wing Safety, Mission Flight Control and Analysis…
  • p. 111 …Such behavior did not necessarily prevent the attainment of some, or even all, mission objectives. 50…
  • p. 131 …Due to excess speed, spacecraft passed 22,000 miles in front of moon, and primary mission…
  • p. 132 …Although Atlas performance was satisfactory, the mission was apparently a failure. No other data available. 134…
  • p. 133 …A flight-control malfunction occurred at about 15 seconds at the start of the pitch program…
  • p. 137 …Vehicle became unstable when B2 pitch control was lost at 121 seconds. Loss of pitch control…
  • p. 138 …The missile then lost attitude control, executing a hard yaw rate tum throughout and beyond the…
  • p. 139 …of the rate gyro or an electrical failure in the pitch channel of the flight control…
  • p. 140 caused yaw and roll rates that the flight control system could not correct. As a result…
  • p. 151 …Attitude control lost during second stage coast period. Third stage spun up, but did not fire…
  • p. 153 …One solid-rocket motor carried to MECO, but mission was still a complete success. 102. SMS…
  • p. 169 …Missile tumbled out of control at 130 seconds, then broke up. 104. IHA (65-210), 1…
  • p. 170 …Nominal mission through transtage second burn shutdown. Attitude control system engine failed to shutdown following vernier…
  • p. 171 …However, satellite propulsion system malfunctioned putting satellite in uncontrollable position with no possibility of restoring mission…
  • p. 172 …control until propellant depletion. Trajectory inaccuracies were compensated for during Stage-2 burn, and the mission…
  • p. 180 …Missiles/Space Vehicle Files, 45th Space Wing, Wing Safety, Mission Flight Control and Analysis (SEO), 1957…
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
No. Mission/ID
Launch
Date
Vehicle
Confiauration
Test
Ranae
Response
Mode
Flight
Phase
Rep.
Cont.
TIROSN 10/13/78 29F WR 0
HEAO-B (A0-52) 11/13/78 50320, SLV-3O/CENT D-1A ER 1
NAVSTAR!V 12/10/78 39F WR 0
STP-78-1 02/24/79 27F WR 0
FLTSATCOM-B (AC-4n 05/04/79 50270, SLV-3D/CENT D-1A ER 1
NOAA-A 06/27/79 25F WR 0
HEAO-C (AC-53) 09/20/79 5033D, SLV-3D/CENT D-1A ER 1
FLTSATCOM-C (AC-49) 01/17/80 50290, SLV-3D/CENT D-1A ER 1
NAVSTARV 02/09/80 35F WR 0
AFSC 03/03/80 F WR 0
NAVSTARVI 04/26/80 34F WR 0
NOAA-B 05/29/80 19F WR NA 1 0
FLTSATCOM-D (A0-5n 10/31/80 5037D, SLV-3D/CENT D-1A ER 1
INTELSAT IV F-2 (AC-54) 12/06/80 5034D, SLV-3D/CENT D-1A ER 1
AFSC 12/08/80 68E WR 5 1 0
COMSTAR D(AC-42) 02/21/81 5023D, SLV-3D/CENT D-1A ER 1
INTELSAT V(Ao-56) 05/23/81 5036D, SLV-3D/CENT D-1A ER 1
NOAA-C 06/23/81 87F WR 0
FLTSATCOM-E (AC-59} 08/06/81 5039D, SLV-3D/CENT D-1A ER NA 1&5 1
INTELSAT V F-3 {AC-55} 12/15/81 5035D, SLV-3D/CENT D-1A ER 1
NAVSTARV!I 12/18/81 76E WR 2 1 0
INTELSAT VF-4 (A0-58) 03/05/82 5038D, SLV-3D/CENT D-1A ER 1
INTELSATV F-5 (AC-60) 09/28/82 50400, SLV-3D/CENT D-1A ER 1
DMSP F-6 12/20/82 60E WR 0
AFSC 02/09/83 H WR 1
NOAA-E 03/28/83 73E WR 0
INTELSAT VF-6 (AO-S1) 05/19/83 50410, SLV-3D/CENT D-1A ER 1
AFSC 06/09/83 H WR 1
NAVSTAR VIII 07/14/83 75E/PAM-D WR 0
DMSP F-7 11/17/83 58E WR 0
AFSC 02/05/84 H WR 1
INTELSAT V F-9 (AC-62) 06/09/84 5042G/CENT D-1A ER 4T 4 1
NAVSTARIX 06/13/84 42E/PAM-D WR 0
NAVSTARX 09/08/84 14E/PAM-D WR 0
NOAA·F 12/12/84 39E WR 0
GEOSTA-A 03/12/85 41E WR 0
INTELSATV F-10 (Ao-63) 03/22185 5043G/CENT D-1A ER 1 .
INTELSATV F-11 (AC-64} 06/30/85 5044G/CENT D-1A ER 1
INTELSATV F-12 (AC-65) 09/28/85 5045G/CENT D-1 A ER 1
NAVSTARXI 10/08/85 55E WR 0
AFSC 02/09/86 H WR 1
NOAA-G 09/17/86 52E WR 0
FLTSATCOM F-7 (AC-66) 12/05/86 5046G/CENT D-1A ER 1
FLTSATCOM F-6 (AC-67) 03/26/87 5048G/CENT D-1A ER 4T 1 1
AFSC 05/15/87 H WR 1
DMSP F-8 06/19/87 59E WR 0