Documents / Report

Department of the Air Force Report, 1996

U.S. Department of War · 1996-09-10 · 181 pages · text from the file's own layer

This final report, dated September 10, 1996, was prepared by the Research Triangle Institute for the Department of the Air Force's 45th and 30th Space Wing safety offices. Titled Modeling Unlikely Space-Booster Failures in Risk Calculations, it shows how rare Mode-5 failures, in which a rocket veers well off its intended flight line, are modeled in the DAMP risk-analysis program. An appendix lists Atlas, Delta, Titan and Thor launch and failure histories through August 1996.

From the source:Release of 2026-05-08 Incident: 9/10/96, N/A. This report describes the Modeling of Unlikely Space-Booster Failures in Risk Calculations, documenting historical launch failure modes and recommending corrective actions to address them using novel modelling techniques.

  • p. 88 …Vehicle loses control at or shortly after liftoff, with all flight directions equally likely. Destruct is…
  • p. 106 …121 (8) Missiles/Space Vehicle Files, 45th Space Wing, Wing Safety, Mission Flight Control and Analysis…
  • p. 111 …Such behavior did not necessarily prevent the attainment of some, or even all, mission objectives. 50…
  • p. 131 …Due to excess speed, spacecraft passed 22,000 miles in front of moon, and primary mission…
  • p. 132 …Although Atlas performance was satisfactory, the mission was apparently a failure. No other data available. 134…
  • p. 133 …A flight-control malfunction occurred at about 15 seconds at the start of the pitch program…
  • p. 137 …Vehicle became unstable when B2 pitch control was lost at 121 seconds. Loss of pitch control…
  • p. 138 …The missile then lost attitude control, executing a hard yaw rate tum throughout and beyond the…
  • p. 139 …of the rate gyro or an electrical failure in the pitch channel of the flight control…
  • p. 140 caused yaw and roll rates that the flight control system could not correct. As a result…
  • p. 151 …Attitude control lost during second stage coast period. Third stage spun up, but did not fire…
  • p. 153 …One solid-rocket motor carried to MECO, but mission was still a complete success. 102. SMS…
  • p. 169 …Missile tumbled out of control at 130 seconds, then broke up. 104. IHA (65-210), 1…
  • p. 170 …Nominal mission through transtage second burn shutdown. Attitude control system engine failed to shutdown following vernier…
  • p. 171 …However, satellite propulsion system malfunctioned putting satellite in uncontrollable position with no possibility of restoring mission…
  • p. 172 …control until propellant depletion. Trajectory inaccuracies were compensated for during Stage-2 burn, and the mission…
  • p. 180 …Missiles/Space Vehicle Files, 45th Space Wing, Wing Safety, Mission Flight Control and Analysis (SEO), 1957…
No. Mission/ID
Launch
Date
Vehicle
Confiauration
Test
Ranae
Response
Mode
Flight
Phase
Rep.
Conf.
354 ABRES {AFSC) 03/06/68 74E WR 0
355 AFSC 04/06/68 107F/ABRES WR 0
356 ABRES (AFSC) 04/18/68 77E WR 0
357 ABRES (AFSC) 04/27/68 78E WR 0
358 ABRES (AFSC) 05/03/68 95F WR 5 1 0
359 ABRES (AFSC) 06/01/68 89F WR 0
360 ABRES (AFSC) 06/22/68 86F WR 0
361 ABRES (AFSC) 06/29/68 32F WR 0
362 AFSC 07/11/68 75F/ABRES WR 0
363 DOD (AA-27) 08/06/68 SLV-3A/AGENA D ER 1
364 ATS-D (AC-17) 08/10/68 5104C, SLV-3C/CENTAUR D ER NA 4 1
365 AFSC 08/16/68 7004, SLV-3/BURNER II WR 4 3 1
366 ABRES (AFSC) 09/25/68 99F WR 0
367 ABRES (AFSC} 09/27/68 84F WR 0
368 ABRES {AFSC) 11/16/68 56F WR 4T 2.5 0
369 ABRES (AFSC) 11/24/68 60F WR 0
370 OAO-A2 (AC-16) 12/07/68 5002C, SLV-3O/CENTAUR D ER 1
371 ABRES (AFSC) 01/16/69 70F WR 0
372 MARINER 6 (MARS) (AC-20) 02/24/69 54030, SLV-3C/CENTAUR D ER NA 1 1
373 AFSC 03/17/69 104F/ABRES WR 0
374 MARINER 7 (MARS) (AC-19) 03/27/69 5105C, SLV-3C/CENTAUR D ER 1
375 DOD (AA-28) 04/12/69 SLV-3A/AGENA D ER 1
376 ATS-E (AC-18} 08/12/69 54020, SLV-3C/CENTAUR D ER 1
377 ABRES (AFSC) 08/20/69 112F WR 0
378 ABRES (AFSC) 09/16/69 100F WR 0
379 ABRES (AFSC) 10/10/69 98F WR 4 1 0
380 ABRES (AFSC) 12/03/69 44F WR 0
381 ABRES (AFSC) 12/12/69 93F WR 0
382 ABRES (AFSC) 02/08/70 96F WR 0
383 ABRES (AFSC} 03/13/70 28F WR 0
384 ABRES (AFSC) 05/30/70 91F WR 0
385 ABRES {AFSC) 06/09/70 92F WR 0
386 DOD (AA-29) 06/19/70 SLV-3A/AGENA D ER 1
387 DOD (AA-30) 08/31/70 SLV-3A/AGENA D ER 1
388 OA0-8 (AC-21) 11/30/70 50030, SLV-3O/CENTAUR D ER 4 2 1
389 ABRES (AFSC) 12/22/70 105F WR 0
390 INTELSAT IV F-2 (AC-25) 01/25171 50050, SLV-3O/CENTAUR D ER 1
391 ABRES (AFSC) 04/05/71 85F WR 0
392 MARINER 8 (MARS) (AC-24) 05/08/71 5405C, SLV-3O/CENTAUR D ER 4T 3 1
393 MARINER 9 (MARS) (AC-23) 05/30/71 5404C, SLV-3O/CENTAUR D ER 1
394 ABRES (AFSC) 06/29/71 103F WR 0
395 AFSC 08/06/71 76F WR 0
396 ABRES (AFSC) 09/01/71 74F WR 0
397 DOD (AA-31) 12/04/71 SLV-3NAGENA D ER 4 1 1
398 INTELSAT IV F-3 (AC-26) 12/19171 50060, SLV-3C/CENTAUR D ER 1
399 INTELSAT IV F-4 (AC-28) 01/22/72 50080, SLV-3O/CENTAUR D ER 1
9/10/96 111 RTI