Documents / Report

Department of the Air Force Report, 1996

U.S. Department of War · 1996-09-10 · 181 pages · text from the file's own layer

This final report, dated September 10, 1996, was prepared by the Research Triangle Institute for the Department of the Air Force's 45th and 30th Space Wing safety offices. Titled Modeling Unlikely Space-Booster Failures in Risk Calculations, it shows how rare Mode-5 failures, in which a rocket veers well off its intended flight line, are modeled in the DAMP risk-analysis program. An appendix lists Atlas, Delta, Titan and Thor launch and failure histories through August 1996.

From the source:Release of 2026-05-08 Incident: 9/10/96, N/A. This report describes the Modeling of Unlikely Space-Booster Failures in Risk Calculations, documenting historical launch failure modes and recommending corrective actions to address them using novel modelling techniques.

  • p. 88 …Vehicle loses control at or shortly after liftoff, with all flight directions equally likely. Destruct is…
  • p. 106 …121 (8) Missiles/Space Vehicle Files, 45th Space Wing, Wing Safety, Mission Flight Control and Analysis…
  • p. 111 …Such behavior did not necessarily prevent the attainment of some, or even all, mission objectives. 50…
  • p. 131 …Due to excess speed, spacecraft passed 22,000 miles in front of moon, and primary mission…
  • p. 132 …Although Atlas performance was satisfactory, the mission was apparently a failure. No other data available. 134…
  • p. 133 …A flight-control malfunction occurred at about 15 seconds at the start of the pitch program…
  • p. 137 …Vehicle became unstable when B2 pitch control was lost at 121 seconds. Loss of pitch control…
  • p. 138 …The missile then lost attitude control, executing a hard yaw rate tum throughout and beyond the…
  • p. 139 …of the rate gyro or an electrical failure in the pitch channel of the flight control…
  • p. 140 caused yaw and roll rates that the flight control system could not correct. As a result…
  • p. 151 …Attitude control lost during second stage coast period. Third stage spun up, but did not fire…
  • p. 153 …One solid-rocket motor carried to MECO, but mission was still a complete success. 102. SMS…
  • p. 169 …Missile tumbled out of control at 130 seconds, then broke up. 104. IHA (65-210), 1…
  • p. 170 …Nominal mission through transtage second burn shutdown. Attitude control system engine failed to shutdown following vernier…
  • p. 171 …However, satellite propulsion system malfunctioned putting satellite in uncontrollable position with no possibility of restoring mission…
  • p. 172 …control until propellant depletion. Trajectory inaccuracies were compensated for during Stage-2 burn, and the mission…
  • p. 180 …Missiles/Space Vehicle Files, 45th Space Wing, Wing Safety, Mission Flight Control and Analysis (SEO), 1957…
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
Flight Rep.
No. Mission/ID Date Conflauration
Test ResponseLaunch Vehicle
Cont.
CURRY COMB II 04/11/62 129D
PhaseRanae Mode
0
RANGER4 04/23/62 133D, LV-3A/AGENA B
WR 0
Daintv Doll 04/26/62 118D, LV-3A/AGENA B
ER
0
BLUE BALL 04/2.7/62 140D
WR
0
AC-1 (SUBORBITAL) 05/08/62 1040 LV-3C/CENT. D ER 4 1
WR
0
CANNONBALL FLYER 05/11/62 127D WR 0
MERCURY7 05/24/62 1070, LV-3B ER 0
Rubber Gun 06/17/62 115D, LV-3A/AGENA B WR 4 3 0
ALLJAZl. 06/26/62 21D WR 0
LONG LADY 07/12/62 1410 WR 0
EXTRA BONUS 07/13/62 67E WR 4 2&2.5 0
Armored Car 07/18/62 1200, LV-3A/AGENA B WR 0
FIRST TRY 07/19/62 130 WR 0
MARINER 1(VENUS) 07/22/62 145D LV-3A/AGENA B ER 5 2 0
HIS NIBS 08/01/62 15F WR 0
Air Scout 08/05/62 1240, LV-3A/AGENA B WR 0
PEGBOARD 08/09/62 8D WR 0
PEGBOARD II 08/09/62 870 WR 4 2.5 0
CRASH TRUCK 08/10/62 57F WR 5 1 0
ws 08/13/62 7F ER 0
MARINER 2 {VENUS) 08/27/62 1790 LV-3A/AGENA B ER NA 2 0
ws 09/19/62 SF ER 0
BRIAR STREET 10/02/62 40 WR 4 2 0
MERCURYS 10/03/62 113D, LV-3B ER 0
RANGERS 10/18/62 2150 LV-3A/AGENA B ER NA 5 0
ws 10/19/62 14F ER 0
CLOSED CIRCUITS 10/26/62 1590 WR 0
ws 11/07/62 16F ER 0
After Deck 11/11/62 1280, LV-3A/AGENA B WR 0
ACTION TIME 11/14/62 13F WR 4 1 0
ws 12/05/62 21F ER 0
DEER PARK 12/12/62 161D WR 0
Bargain Counter 12/17/62 1310, LV-3A/AGENA B WR 4T 1 0
OAKTREE 12/18162 64E WR 4T 1 0
FLY HIGH 12/22162 160D WR 4 2 0
BIG SUE 01/25/63 390 WR 4 1 0
FAINT CLICK 01/31/63 1760 WR 0
FLAG RACE 02/13/63 1820 WR 0
PITCH PINE 02/28/63 1880 WR 0
ABRES-1 03/01/63 134F 0
TALL TREE3 03/09/63 1020
ER
WR 5 1 0
TALL TREE2 03/11/63 640 WR 0
TALL TREE 1 03/15/63 460 WR 4T 2 0
TALL TREES 03/15/63 63F WR 0
LEADING EDGE 03/16/63 193D WR 4T 2 0
KENDALL GREEN 03/21/63 83F WR 4 2.5 0
9/10/96 106 RTI

Not linked to a story yet.

About this file

Report, from the pursue collection. The PDF is mirrored here; the original link is above. 181 pages are in the text index: search them above, or from the library's search.