This final report, dated September 10, 1996, was prepared by the Research Triangle Institute for the Department of the Air Force's 45th and 30th Space Wing safety offices. Titled Modeling Unlikely Space-Booster Failures in Risk Calculations, it shows how rare Mode-5 failures, in which a rocket veers well off its intended flight line, are modeled in the DAMP risk-analysis program. An appendix lists Atlas, Delta, Titan and Thor launch and failure histories through August 1996.

From the source:Release of 2026-05-08 Incident: 9/10/96, N/A. This report describes the Modeling of Unlikely Space-Booster Failures in Risk Calculations, documenting historical launch failure modes and recommending corrective actions to address them using novel modelling techniques.

  • p. 88 …Vehicle loses control at or shortly after liftoff, with all flight directions equally likely. Destruct is…
  • p. 106 …121 (8) Missiles/Space Vehicle Files, 45th Space Wing, Wing Safety, Mission Flight Control and Analysis…
  • p. 111 …Such behavior did not necessarily prevent the attainment of some, or even all, mission objectives. 50…
  • p. 131 …Due to excess speed, spacecraft passed 22,000 miles in front of moon, and primary mission…
  • p. 132 …Although Atlas performance was satisfactory, the mission was apparently a failure. No other data available. 134…
  • p. 133 …A flight-control malfunction occurred at about 15 seconds at the start of the pitch program…
  • p. 137 …Vehicle became unstable when B2 pitch control was lost at 121 seconds. Loss of pitch control…
  • p. 138 …The missile then lost attitude control, executing a hard yaw rate tum throughout and beyond the…
  • p. 139 …of the rate gyro or an electrical failure in the pitch channel of the flight control…
  • p. 140 caused yaw and roll rates that the flight control system could not correct. As a result…
  • p. 151 …Attitude control lost during second stage coast period. Third stage spun up, but did not fire…
  • p. 153 …One solid-rocket motor carried to MECO, but mission was still a complete success. 102. SMS…
  • p. 169 …Missile tumbled out of control at 130 seconds, then broke up. 104. IHA (65-210), 1…
  • p. 170 …Nominal mission through transtage second burn shutdown. Attitude control system engine failed to shutdown following vernier…
  • p. 171 …However, satellite propulsion system malfunctioned putting satellite in uncontrollable position with no possibility of restoring mission…
  • p. 172 …control until propellant depletion. Trajectory inaccuracies were compensated for during Stage-2 burn, and the mission…
  • p. 180 …Missiles/Space Vehicle Files, 45th Space Wing, Wing Safety, Mission Flight Control and Analysis (SEO), 1957…
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
No. Mission/ID
Launch
Date
Vehicle
Confiauration
Test
Ranae
Response
Mode
Flight
Phase
Rep.
Conf.
MERCURY2 02/21/61 67D LV-38 ER 0
ws 02/24/61 9E ER 0
ws 03/13/61 13E ER 4 2 0
ws 03/24/61 16E ER 4 1.5 0
MERCURY3 04/25/61 100D LV-38 ER 3 1 0
ws 05/12/61 12E ER 0
LITTLE SATIN 05/24/61 95D WR
4 1
0
0
0
ws
SURE SHOT
05/26/61
06/07/61
18E
27E
ER
WR
ws 06/22161 17E ER 4 1 0
ws 07/06/61 22E ER 0
Polar Orbit (Midas Ill) 07/12/61 97D, LV-3A/AGENA B WR 0
ws 07/31/61 21E ER 0
ws 08/08/61 2F ER 0
NEW NICKEL 08/22/61 1010 WR 0
RANGER 1 08/23/61 111 DLV-M{AGENA ER NA 4 0
ws 09/08/61 26E ER 4 2 0
First Motion (Samos Ill)
MERCURY4
ws
09/09/61
09/13/61
10/02/61
106D LV-3A/AGENA B
88D LV-38
25E
WR
ER
ER
1 1 0
0
0
ws
Big Town (Midas IV)
ws
10/05/61
10/21/61
11/10/61
30E
105D LV-3A/AGENA B
32E
ER
WR
ER
NA
4T
2
1
0
0
0
• RANGER2
ws
Round Trip (Samos IV)
11/18/61
11/22161
11/22/61
117D LV-3A/AGENA
4F
108D LV-3A/AGENA B
ER
ER
WR
NA
4T
4
2
0
0
0
MERCURY5
BIG PUSH
ws
11/29/61
11/29/61
12/01/61
93D LV-38
53D
35E
ER
WR
ER
0
0
0
BIG CHIEF
ws
ws
ws
12/07/61
12/12/61
12/19/61
12/20/61
82D
SF
36E
6F
WR
ER
ER
ER
5
4T
2
2
0
0
0
0
Ocean Wav (Samos V) 12/22/61 114D LV-3A/AGENA B WR NA 2 0
BLUE FIN 01/17/62 123D WR 0
BLUE MOSS 01/23/62 132D WR 0
RANGER3
ws
BIG JOHN
MERCURY6
01/26/62
02/13/62
02/16/62
02/20/62
121D LV-3A/AGENA B
40E
137D
1090, LV-3B
ER
ER
WR
ER
NA
NA
2&5
1.5
0
0
0
0
CHAIN SMOKER 02/21/62 52D WR 4 1 0
SILVER SPUR 02/28/62 66E WR 4T 1.5 & 2 0
Loose Tooth 03/07/62 1120, LV-3A/AGENAB WR 0
CURRY COMB I 03/23162 134D WR 0
ws
Night Hunt
04109/62
04/09/62
11F
11 OD LV-3A/AGENA B
ER
WR
1
NA 1
1
0
0
9/10/96 105

Not linked to a story yet.