Documents / FOIA release

roswell

Office of the Secretary of Defense · 993 pages · text from the file's own layer

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published in 1995 by Headquarters United States Air Force. It was written in response to Representative Steven H. Schiff's request and a General Accounting Office audit, and it contains Col. Richard L. Weaver's report and 1st Lt. James McAndrew's synopsis, along with attachments, appendices and photographs. The report says researchers found no evidence of an extraterrestrial craft or crew. It concludes that the 1947 debris came from a Project MOGUL balloon train.

  • p. 106 n1e Public Information Office was host during the mon~~ to the Senior Air Scouts of ~ie…
  • p. 801 …Up to Boston with Lt Frank Ryder with Navy and \.JHOI April 15 Mon. Contacted Doc…
  • p. 802 …I caught 5.50 train out of Penn Station to Red Bank, NJ April 29 Mon…
  • p. 804 …Dec 9 Mon. Oakhurst. Finished getting all equipment ready for Alamogordo. Chantz, Woody and I went…
  • p. 807 …Arrived AP about 1230 Feb 3 Mon Oakhurst. Peoples in Washington regarding balloon ascention in June…
  • p. 808 …Feb 24 Mon. Alamogordo. '.faited for air transportation today but none available and may not be…
  • p. 809 …In Asbury Park 3 pm March 10 Mon Oakhurst. Vivian and I worked on Flight 25…
  • p. 810 …Cleaned out hanger and emptied trash out at East White Sands April 7 Mon Talked to…
  • p. 811 …April 21 Mon. Alamogordo Air Base. Bill Edmonston and I went out to Tularosa Range and…
  • p. 812 …Took sleeper out of Canton for NYC May 12 Mon. Arrived NYC and caught 0940 out…
  • p. 813 …May 26 Mon. Worked on Tests 1 and 2 records today. No signals from Roswell - some…
  • p. 814 …Took Treland, Mears, Winton, Olsen to Alamogordo to catch train this pm June 9 Mon. Bill…
  • p. 815 …July 7 {Mon) Alamogordo. Balloon Flight 11 A off at 0503. Big plastic with small auxiliary…
  • p. 816 …July 1 Mon. To cabins near Geneva, N.Y. July 15 Tues. Stopped at Syracuse. Got…
(b)
gears or poor alignment of the rotating cy-
linder. The motor gears may be cleaned with
carbon tetrachloride and a small clean brush.
If the trouble is due to misalignment, the in-
strument should not be used since this will
affect the rotation at a non-uniform rate and
thus destroy the entire accuracy of the record..
Calibrate the instrument. The following equip-
ment is required for the calibration: ·
Vacuum pump
Bell jar
Base plate with at lest 4 electrical leads
Manometer
Tape recorder
The vacuum pump should be capable of evacuating
the bell jar to a pressure lower than that to
be reached by the balloon in flight. A pressure
of ten millibars. corresponding to about
100.000 feet elevation is usually a good minimum.
Four wires are necessary to conduct the six
volts to the motor and to transmit the reference
and pressure signals. The wires must pass out
of the bell jar through an air-tight seal in
the base plate. The base plate also needs a
tube leading to the manometer and a tube to the
vacuum pump. It is advisable to use two sepa-
rate tubes rather than placing the manometer
lead in the same line as the pump lead in order
to obtain the pressure in the bell jar rather
than that in the pumping line.
In operation the negative line of the battery
leads is used as the ground connection of the
output signal.
A tape recorder such as the Brush Development
Co. model BL-902 oscillograph and amplifier
BL-905. is needed to record the signal both
during calibration and during the balloon flight.
The Brush recorder is used at present and the
discussion of the operation will be made in terms
of the characteristics of this instrument. When
using the slow speed of the recorder, which
feeds the paper at the rate of 30 centimeters
per minute, the distance between successive re-
ference marks will be 30 to 40 centimeters de-
-56-

Cases discussed

About this file

FOIA release, from the osd collection. The PDF is mirrored here; the original link is under it. 993 pages are in the text index: search them above, or from the library's search.