Documents / FOIA release

roswell

Office of the Secretary of Defense · 993 pages · text from the file's own layer

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published in 1995 by Headquarters United States Air Force. It was written in response to Representative Steven H. Schiff's request and a General Accounting Office audit, and it contains Col. Richard L. Weaver's report and 1st Lt. James McAndrew's synopsis, along with attachments, appendices and photographs. The report says researchers found no evidence of an extraterrestrial craft or crew. It concludes that the 1947 debris came from a Project MOGUL balloon train.

  • p. 106 n1e Public Information Office was host during the mon~~ to the Senior Air Scouts of ~ie…
  • p. 801 …Up to Boston with Lt Frank Ryder with Navy and \.JHOI April 15 Mon. Contacted Doc…
  • p. 802 …I caught 5.50 train out of Penn Station to Red Bank, NJ April 29 Mon…
  • p. 804 …Dec 9 Mon. Oakhurst. Finished getting all equipment ready for Alamogordo. Chantz, Woody and I went…
  • p. 807 …Arrived AP about 1230 Feb 3 Mon Oakhurst. Peoples in Washington regarding balloon ascention in June…
  • p. 808 …Feb 24 Mon. Alamogordo. '.faited for air transportation today but none available and may not be…
  • p. 809 …In Asbury Park 3 pm March 10 Mon Oakhurst. Vivian and I worked on Flight 25…
  • p. 810 …Cleaned out hanger and emptied trash out at East White Sands April 7 Mon Talked to…
  • p. 811 …April 21 Mon. Alamogordo Air Base. Bill Edmonston and I went out to Tularosa Range and…
  • p. 812 …Took sleeper out of Canton for NYC May 12 Mon. Arrived NYC and caught 0940 out…
  • p. 813 …May 26 Mon. Worked on Tests 1 and 2 records today. No signals from Roswell - some…
  • p. 814 …Took Treland, Mears, Winton, Olsen to Alamogordo to catch train this pm June 9 Mon. Bill…
  • p. 815 …July 7 {Mon) Alamogordo. Balloon Flight 11 A off at 0503. Big plastic with small auxiliary…
  • p. 816 …July 1 Mon. To cabins near Geneva, N.Y. July 15 Tues. Stopped at Syracuse. Got…
D. Accessory Flight Equipment
On most flights, three pieces of equipment are added
to the train for special purposes. These are: (l) a
banner, (2) a drag parachute, and (3) safety-weights.
The banner is a red or yellow cheesecloth rectangle,
3 x 6 or 6 x 12 feet, with aluminum spreaders at top
and bottom. Shown in Figure 15, the banner is tied
taut to the load line, and serves to reduce sidewise
swaying as the balloon ri,es. Due to the bright color,
it is useful in locating the balloon after being grounded
and acts as a warning to air craft during descent and
ascent. If thodolite stadia determinations are being
made, the banner can be used as one of the ch~k points
on the train.
The drag parachute is inserted into the train above the
banner in inverted position and serves to retard the
ascending balloon somewhat, thus reducing the probability
of bursting due to excessive rates of rise.
To correct a too slow rate of rise, (which may result
from under inflation due to gage errors, freezing of
valves, or excessive adiabatic cooling of the gas during
inflation) two small bags of sand or shot are added to
the bottom of the restraining line. If it appears that
the balloon is not rising with the desired velocity as
it picks up the equipment, one or both of these safety
weights are cut free. The weight of each bag is equal
to the desired free lift, so that if the computed free
lift is not available, this lift may be supplied. Prior
to the adoption of this practice, it was necessary to sacri-
fice equipment or the balloon in such oases.
E. Tracking and Recording Instruments
Depending upon the nature of the flight, the weather condi-
tions, and the equipment available. gear may be added to
the flight train to aid in horizontal position determination
and altitude measurement. The discussion of suitable
equipment for such work is given in Section VII• In general,
the equipment added may be either radio transmitters or
gear of other assorted types. Each unit is rigged sep-
arately, with hooks at each end of the line segment.
Prior to the inflation of the balloon a thorough check
of all such equipment, especially radio gear, is made.
It is necessary to have spare equipment tested, calibrated,
and assembled for last minute replacement if failure is
detected at this time.
-27-

Cases discussed

About this file

FOIA release, from the osd collection. The PDF is mirrored here; the original link is under it. 993 pages are in the text index: search them above, or from the library's search.