Documents / FOIA release

roswell

Office of the Secretary of Defense · 993 pages · text from the file's own layer

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published in 1995 by Headquarters United States Air Force. It was written in response to Representative Steven H. Schiff's request and a General Accounting Office audit, and it contains Col. Richard L. Weaver's report and 1st Lt. James McAndrew's synopsis, along with attachments, appendices and photographs. The report says researchers found no evidence of an extraterrestrial craft or crew. It concludes that the 1947 debris came from a Project MOGUL balloon train.

  • p. 106 n1e Public Information Office was host during the mon~~ to the Senior Air Scouts of ~ie…
  • p. 801 …Up to Boston with Lt Frank Ryder with Navy and \.JHOI April 15 Mon. Contacted Doc…
  • p. 802 …I caught 5.50 train out of Penn Station to Red Bank, NJ April 29 Mon…
  • p. 804 …Dec 9 Mon. Oakhurst. Finished getting all equipment ready for Alamogordo. Chantz, Woody and I went…
  • p. 807 …Arrived AP about 1230 Feb 3 Mon Oakhurst. Peoples in Washington regarding balloon ascention in June…
  • p. 808 …Feb 24 Mon. Alamogordo. '.faited for air transportation today but none available and may not be…
  • p. 809 …In Asbury Park 3 pm March 10 Mon Oakhurst. Vivian and I worked on Flight 25…
  • p. 810 …Cleaned out hanger and emptied trash out at East White Sands April 7 Mon Talked to…
  • p. 811 …April 21 Mon. Alamogordo Air Base. Bill Edmonston and I went out to Tularosa Range and…
  • p. 812 …Took sleeper out of Canton for NYC May 12 Mon. Arrived NYC and caught 0940 out…
  • p. 813 …May 26 Mon. Worked on Tests 1 and 2 records today. No signals from Roswell - some…
  • p. 814 …Took Treland, Mears, Winton, Olsen to Alamogordo to catch train this pm June 9 Mon. Bill…
  • p. 815 …July 7 {Mon) Alamogordo. Balloon Flight 11 A off at 0503. Big plastic with small auxiliary…
  • p. 816 …July 1 Mon. To cabins near Geneva, N.Y. July 15 Tues. Stopped at Syracuse. Got…
1947 11
to return. Receiver at plane did not work at all. Ground receiver worked for a short
time but did not receive explosions. B-17 and most of personnel out to Ros·well - recovered
equipment some 25 mi east of Roswell. Out at 10 this morning, got T1~ and went out to
range. Fired shots 12 to 18 every hour. Last of bombing tests this week.
June 6 Fri. NYU personnel getting ready for flight tomorrow. Conference about noon, Hackman
with radiosonde, Olsen and Godbee with receiver to Roswell - also Smith on theodolite.
Regular equipment in plane.Edmundson and Reynolds to operate equipment at labs - receiver
with GR8. Worked on adopting GR8 this pm and this evening. Fired some shots pm at site #4
but no transmitter for sonobuoy. This pm put McCurdy low frequency amplifier in circuit
before GR8 and have plenty of signal.
Jmne 7 Sat. Balloon flight off about 530. Dribbler? broken on takeoff. Balloon was to
60,000':, broke left balloons then train came down somewhere in mountains. Recordings at
north hanger, and at Roswell but plane did not receive. Shot at 6, 630, 7, 730, 8 and 830
at site #4. Plane out to find balloons but no luck. All NYU personnel and John Aaden off
on B-17 - Lewis, Gallagher. Went over to Alamogordo with Ireland, Minton, Olsen and Mears
but no train today - making reservations for tomorrow.
June 8, Sun. Rancher, Sid West, found balloon train 25 mi south of High Rolls in mountains.
Contacted him and made arragements to recover equipment Monday. Got all recordings of
balloon flights. Took Treland, Mears, Winton, Olsen to Alamogordo to catch train this pm
June 9 Mon. Bill Godbee and Don Reynolds went out to Sid West's ranch south of High Rolls
and broughtback recovered balloons- clock, 2 radiosondes, sonobuoy and microphone and lower
part of dribbler. Bill Edmondson cleaning up hanger and sorting out equipment of NYU. Worked
today on balloon records (GR8) from north hanger. No definite signals obtained. Took inv-
entory MRs.
June 10 Tues. Bill G , Bill E and Don worked on equipment, repairing GR8, T21 mikes, etc.
Getting ready for rocket Thursday. Worked on GR8 recordings from Hagerman, Tests 3,4,5,6.
No signals obtained. Worked on balloon tests from Roswell - no signals. V on Gila R tests
3,4,5,6, Eileen on V2 amplitudes.
June 11 Wed. Bill Godbee and I went out to Tulerasa Range and located Site ~5 for bombing,
24 mi N of Site #3 - roads bad. Laid ~ut wire for shooting, Don and Bill E getting ready
for rocket. Checked Rubicon records, all 3 sites.
June 12 Thurs. All rockets postponed Until July 3 rocket of S.C.E.L. Bill E, Don, Bill G
went down to El Paso and then SE along Rio Grande. LocatedLlistenine site south of Clint,
Texas and layed out wires and dug holes. Worked on bombing flights from Oakhurst.
June 13 Fri. Men off today. '.' worked on tests 3,4,5,6 Tularosa bombing. E orr.V-2 rocket
amplitudes. I plotted T-X all sky waves and started reviewing March 11 and 17 records.
June 14 Sat. BillE and family, Don Rand family, V, E and I to Carlsbad.
June 15 Sun. Through Carlsbad Caverns and back to Alamogordo.
June 16 Mon. Men off today. Worked on eastern shore cruises, plotting T-X corrected to 68
kms & worked on apparent velocit~es and differences in azimuth.
June 17 Tues. Men left for Silver City and Febrero? near El Paso for bombing tests. Worked
on Cruises.
June 18 Wed. Test 7 of Tularosa Bombing Program, Shots at 7, 930 and 12)0. Men called in
from field to aheck clocks. Weather poor - raining at all sites. E on V2 rockets, V Cruises.
June 19 Thurs. Test 8 of Tularosa bombing program, shots at 1600, 1830, 2100 , 2400.
'lleather poor - rainy at Alamogordo.
June 20 Fri Finish of Test 8. Shots at 0000 and 02)0, Sites 1,3,5. Men back today. Godbee,
Reynolds at Silver City got all shots, Edmondson at El Paso @ot 1 possibly 2. Looked over
all Fabens records today. Eon weather data, rocket firings,V on Tests 3,4,7 and Flights.
June 21 Sat Worked on GR8 records from Fabens - calculated azimuth and elevation angles -
Fabens recordings and some of Silver City.
June 22 Sun. On trip with V & E - San Cruzes, Hot Springs, Carizzo
Week of Jan 23-28 Alamogordo Air Base. Men worked on~equipment for sound ranging Monday
and made arrangements for off base transportation, had to get some from Base Motor Pool;
Bill G, Don R left am for Gila Valley and Bill E went to Fabens. Tests 9, 10 Wednesday 25
and Thurs, Fri 26-27. Test 9: 7-10-13-16-18 Sites 1-3-5-)-1. Wen~ out with Sgt Rand.
Contacted by telephone Wed night and Thursday. Shot 10 Thurs, Fri at 18-21-00-03-05. Out
with Sgt Rand again. Men in Fri pm. Good results from west, but poor or nothing from Fabers.
Looked over some of Fabens records Sat. V worked on Tests 7-8 getting all data, including
amplitudes, then worked on Flights 1-27. Got met data for all flights up to 18 kms except
Oct ones. Found one whole minute error in timing on 24A flight which now checks with others

Cases discussed

About this file

FOIA release, from the osd collection. The PDF is mirrored here; the original link is above. 993 pages are in the text index: search them above, or from the library's search.