Documents / FOIA release

roswell

Office of the Secretary of Defense · 993 pages · text from the file's own layer

The Roswell Report: Fact versus Fiction in the New Mexico Desert was published in 1995 by Headquarters United States Air Force. It was written in response to Representative Steven H. Schiff's request and a General Accounting Office audit, and it contains Col. Richard L. Weaver's report and 1st Lt. James McAndrew's synopsis, along with attachments, appendices and photographs. The report says researchers found no evidence of an extraterrestrial craft or crew. It concludes that the 1947 debris came from a Project MOGUL balloon train.

  • p. 225 …Well, Boford was Navy, that was the Navy .•• Q: Like taking a Pi Ball reading now…
  • p. 226 …fabricate balloons for us. During that period we heard of the Navy project that was going…
  • p. 242 …But were any of those used as precursors to Mogul or ••. A: None whatsoever. That was…
  • p. 319 …Ewing had conducted considerable research for the Navy during World War II, studying, among other things…
  • p. 789 …for six hours using a non-extensible envelope vri th the addition of a balla.st…
  • p. 801 …Vet Gifford ;.;ho has 0 0' sea rescue boat this project is planning to use. Stayed…
  • p. 802 …tlyckoff, Hungerfield, 'faux and ~yself regarding Navy participation with us in Crossroads. Captain Kellogg of Weather…
  • p. 815 …Schneider up with 0 'Day to check use as NYU station. Alamoggrdo crew helped~.get helium…
1/28/47 Kollsman Instrument ·Co.
Elmhurst, L. I.
Att; ?a.ul Goudy
2/3/47 Contracting Officer
Watson Laboratories
Red Bank, New Jersey
2/7/47 ~atson Laboratories
Red Bank, New Jersey
Att: Mr. D. Rigney
2/10/47 Contracting Officer
Watson Laboratories
Red Bank, New Jersey
2/11/47 Patterson Bros.
New York City
Att: Mr. H. Carey
2/18/47 Contracting Officer
Watson Laboratories
Red Bank, N. J.
2/24/47 General :Hills
Minneapolis, Minn.
Mr. 0. c. ~inzen
Request for quotation Quotation supplied.
of 3 ea. of the follow-
ing altitude control
equipment:
1. Motor switched
modulators.
2. Elec. controlled
dribblers.
3. Mech. controlled
dribblers.
Forwarding quote from Not approved.
Unexcelled & requesting
approval.
Requesting permission Permission granted.
to build a 27 cubic foot
inflation shelter.
Forwarding quotation
received from Kollsman
Instrument Co. for the
necessary control de-
vices for the constant
level balloon.
Permission granted
to place subcontrac-
Advising that one Ungar Replacement made.
electric soldering pencil
is being returned under
separate cover as it vas
received in unusable con-
dition. Request for re-
placement made. Quotation
enclosed. ··
Requesting permission toPermission withheld.
place subcontract with
Unexcelled Chern. Corp.
for the fabrication of
be.lloons.
Request th.".t quotation Declining to quote
be supplied for the until after confer-
fabrication of 15-15 ft. ence with NYU
diameter balloons and representa~ives.
6-3 ft. diameter balloons
made of various thick-
nesses of polyethylene
and Saran.
- 9 -

Cases discussed

About this file

FOIA release, from the osd collection. The PDF is mirrored here; the original link is under it. 993 pages are in the text index: search them above, or from the library's search.